Original source · versioned page text
Judgement - 11C Church Street
Resubmission of Amended Plans Required
3. The conditions of this Decision Notice require resubmission of plan/s to Council with
amendments. Please address the amended plan/s to Council’s Development
Assessment Branch with the Reference No. MCU21/0031 separate to any Operational
Works application. To avoid delays and assessment issues with the Operational Works
application, it is recommended the plan/s be resubmitted prior to lodgement of any
Operational Works application.
Infrastructure Charges
4. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue.
Balance Lot for Staged Building Format Plans
5. In accordance with the Planning Act 2016, any proposal to stage the titling arrangements
of the development such that a Building Format Plan is registered with a balance lot for
future development will first require a Development Permit for Reconfiguring a Lot be
obtained from Council.
Sustainability
6. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot
water, photovoltaic systems (including the use of inverter/charges), solar panels, water
saving devices and rainwater harvesting.
Qualified Person
b. For the purpose of preparing a Landscape Plan, a qualified person is considered
to be a landscape architect, landscape designer and/or horticulturist with a
minimum of 3 years current experience in the field of landscape design.
7. For the purpose of preparing an Arborist Report, and for certifying compliance with the
arboricultural requirements of this Decision Notice a qualified person is considered to be
a person with either:
a. ISA certification; or
h. a Diploma of Arboriculture in addition to a minimum of 3 years current experience
in the field of arboriculture.
8. For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
be a landscape architect or ecologist with a minimum of 3 years current experience in
the field of landscape design.
9. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered
to be an ecologist with a minimum of 3 years current experience in the field of bushfire
assessment and management.
Building and Construction Industry (Portable Long Service Leave) Levy
10. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
6463731_1
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.