Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Judgement - 11C Church Street

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      Resubmission of Amended Plans Required
3.    The conditions of this Decision Notice require resubmission of plan/s to Council with
      amendments. Please address the amended plan/s to Council’s Development
      Assessment Branch with the Reference No. MCU21/0031 separate to any Operational
      Works application. To avoid delays and assessment issues with the Operational Works
      application, it is recommended the plan/s be resubmitted prior to lodgement of any
      Operational Works application.
      Infrastructure Charges
4.    All developments and/or changes to existing developments may require payment of
      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
      Resolution” made pursuant to the planning legislation and regulations current at the time
      of issue.
      Balance Lot for Staged Building Format Plans
5.    In accordance with the Planning Act 2016, any proposal to stage the titling arrangements
      of the development such that a Building Format Plan is registered with a balance lot for
      future development will first require a Development Permit for Reconfiguring a Lot be
      obtained from Council.
      Sustainability
6.    Council encourages sustainable and energy efficient building design for all development,
      including the use of sustainable building materials, energy efficient fittings, solar hot
      water, photovoltaic systems (including the use of inverter/charges), solar panels, water
      saving devices and rainwater harvesting.
      Qualified Person
      b.    For the purpose of preparing a Landscape Plan, a qualified person is considered
            to be a landscape architect, landscape designer and/or horticulturist with a
            minimum of 3 years current experience in the field of landscape design.
7.    For the purpose of preparing an Arborist Report, and for certifying compliance with the
      arboricultural requirements of this Decision Notice a qualified person is considered to be
      a person with either:
      a.    ISA certification; or
      h.    a Diploma of Arboriculture in addition to a minimum of 3 years current experience
            in the field of arboriculture.
8.    For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
      be a landscape architect or ecologist with a minimum of 3 years current experience in
      the field of landscape design.
9.    For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
      with the bushfire requirements of this Decision Notice, a qualified person is considered
      to be an ecologist with a minimum of 3 years current experience in the field of bushfire
      assessment and management.
      Building and Construction Industry (Portable Long Service Leave) Levy
10.   The QLeave levy must be paid prior to the issue of a development permit where it is
      required. Council will not be able to issue a Decision Notice without receipt of details
      that the Levy has been paid.




                                                                                        6463731_1


                                                                                                    12
Log in to download the original file

Judgement - 11C Church Street.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.