Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Judgement - 11C Church Street

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      a.    Car parking provision, area to be dedicated as Environmental Reserve and all
            easements to be correctly detailed on the existing Site Plan – Proposed. For this
            purpose, the extent of the Environmental Reserve is detailed at condition 49.
      Nature and Extent of Approved Use
4.    Eleven (11) small dwellings and 4 x other dwellings are approved.
      Staging
5.    The development may be staged in accordance with the stage boundaries shown on the
      Approved Construction Staging Plan (Dwg PA 104 Construction Staging Plan). If staged,
      the development must be completed sequentially in the stage order indicated on the
      Approved Plans provided that:
      a.    Any vehicle access, onsite maneuvering, car parking, landscaping and
            infrastructure services required to service the particular stage are constructed with
            that stage.
      b.    Rehabilitation works must be undertaken as part of stage 1 and be completed prior
            to the commencement of the use.
      c.    The full extent of the stormwater drainage system is to be constructed with the first
            stage which occurs on site. Planting of the bioretention filter surface may be
            delayed until the final stage of the development and an interim protective cover
            applied to the surface until planting occurs. Interim drainage works are to be
            provided to connect any interim stages to the combined bioretention and detention
            basin such that the intent of the Stormwater Management Plan for the site is
            achieved with each stage. Details of any required interim drainage works are to be
            provided with the Operational Works Application for each stage.
      Sunset Clause
6.    Pursuant to s88 of the Planning Act 2016, the uncompleted aspects of this development
      approval lapse if the whole of the approved use has not happened by 2 years from the
      expiration date of the Currency Period. The undeveloped parts of the site must be
      turfed if the works have not been completed by 2 years from the expiration date of
      the Currency Period.
      Currency Period
7.    This development approval lapses if the first change of use has not happened within 6
      years after the approval starts to have effect, unless an application to extend the
      currency period is approved by Council.
      Built Form and Development Appearance
8.    The maximum height of the development must not exceed 8 metres above the natural
      ground level.
9.    All air conditioning units or other mechanical equipment must be fully enclosed or
      screened such that they are not visible from the street frontages nor adjoining properties.
10.   Waste storage areas, clothes drying areas and external storage areas must be screened
      from view of the street.
11.   The development must incorporate the colour scheme as outlined in the approved colour
      palette and approved plans.




                                                                                         6463731_1


                                                                                                     2
Log in to download the original file

Judgement - 11C Church Street.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.