3. Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act 1997, all outstanding rates and
charges due and payable to Sunshine Coast Regional Council in respect of the lots being
reconfigured must be paid prior to endorsement of the Survey Plan.
4. Legal documentation provided with the Plan of Survey lodged for endorsement must include
certification from the surveyor stating that all infrastructure belonging Lot 788 on RP910421
and Lot 1 on SP116622, except as modified herein, is contained wholly within each new
individual allotment.
5. The boundary realignment between Lot 788 on RP910421 (Lot 788) and Lot 1 on SP116622
(Lot 1) must be as shown on the approved plan 08096OT dated 8 October 2008 as submitted
by Ken Hicks and Associates except as modified herein.
6. Any changes required by Council’s Solicitor must be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
the endorsing of the Plan of Survey.
Water Mains and Connections
7. Each new individual allotment must be connected to Council’s existing town water supply in
accordance with Council’s standards and requirements at no cost to Council.
8. Each individual water connection to the water reticulation system must extend to the property
boundary and be metered. All fees for the supply of water meters must be paid to the Council.
9. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s CEO prior to endorsement of the
Plan of Survey.
Services
10. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of telephone services to each new individual allotment. In this regard written
confirmation from an approved telecommunication agency stating that each new individual
allotment are serviced by appropriate telecommunication services shall be submitted to the
Council prior to Council endorsing the Plan of Survey.
11. An underground electricity service must be provided to each new individual allotment. An
approved ENERGEX Electrical Design Consultant shall prepare detailed designs of the
electrical proposal to serve the lots, unless already provided.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of Lot 788.
Easement for Services
12. In conjunction with the endorsement of the Plan of Survey by Council, the applicant shall
create a registered easement over any infrastructure for electricity and telecommunication as
may be required by the service providers.
General
13. Any alteration of a public utility or other facility necessitated by the boundary realignment or
associated construction works either internal or external to the site shall be at no cost to
Council.
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00001795.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 53 KB (small file)
- File type
No other editions are linked here.