Landscape and Rehabilitation Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn15 JIRRIMA CRES, COOROIBAH Re abilitation OP Plan Oct 2021 44 RP136462 The following landscape operational works plan package consists of the following schedule of drawings; LD1 eneral Notes LD2 eneral Notes LD3 Finis es c edule aintenance Notes Typical etail LD4 Plant c edules LP1-2 andscape Plans This package has been developed to comply with; JIRRIMA CRESCENT LOT 2 LOT 1 P 21 0040 101 SP191688 LP2 LP1 Noosa Plan 2020 F1 nvasive Plants isted in t e iosecurity ct 2014 Noosa iosecurity Plan 2020 Sources; C con urveying To n Planning Sample Approvals; · Furnis it follo ing samples for approval prior to construction; EMT A Composted Forest itter EMT A SP156380 100 SP156380 11 10 SP156380 SP156380 15 JIRRIMA CRES, COOROIBAH, QLD SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S Lot 43 RP 136461 Client Project NORTH TITLE: JOB No.: S21091111 anembo consultants FILE: 211013 Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LD1 Landscape Architects Environmental Project Management This document is the copyright of anembo consultants & shall LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 1 OF 6 anembo consultants pty.ltd. Sunshine Coast: PO Box 24 A.B.N. 75 089 473 156 Moffat Beach QLD 4551 not be copied without written approval, nor shall it be used except for the development and the site specified. Scale & OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000 can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 GENERAL NOTES -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
N Not applicable OC On centre
P aintenace Period m2 quare metres
m3 Cubic etres T P Typical · ll stockpiles are to be protected it suitable erosion control devices graded to · egetation to be protected is plan nominated predominately native species in a PRELIMINARIES
ensure control of runoff ealt y safe condition t at are not located so as to interfere it required · efore ork commences t e PER is to organise a pre start meeting it t e
N T National ssociation of Testing ut orities PER uperintendent
uP C nplasticised polyvinyl C loride Pipe N C Noosa ire Council · Coordinate installation of sediment erosion control devices it civil contractor to approved site orks landscape arc itect and CC environment landscape officer to establis scope of
ensure compatibility consistency in control measures · T e follo ing table summari es t e vegetation management program elements; orks management procedures and clarify any issues
ater by esign O andscape ssessment Officer
· ll e posed surfaces once completed s all be immediately stabili ed to prevent · ere any discrepancies occur refer to
erosion TREE PROTECTION MEASURES
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE
· T e follo ing tree protection measures must at all times be ad ered to during any
· part from declared eeds all e isting vegetation s all be retained as been OPERATIONS - DISTURBED AREAS
EDGING on site orks generally in accordance it 49 0 2009 protection of trees on · dentify eeds f unsure consult ll ot er vegetation to be protected and
identified it retention protection measures for suc are nominated erein
pade Edge development sites ill advise ere measures are required at Pre start but is
· dentified areas are confined to areas of eed management t ose nominated on retained
t ese plans it associated orks described erein · nstall pade Cut edge as located on plans as per detail generally to standard s of e isting trees t at are s o n as re abilitation areas · Treat all eeds and pasture grasses Refer to eed Removal c edule
· Prior to commencement of orks t e contractor to organise a pre construction · ecompact ground and cultivate to 5mm deep
· Plant sc edules are as per;
REVEGETATION AREAS meeting to identify trees for protection removal and or pruning · rade ground surface to create smoot falls a ay from pat s ere necessary
Soil · Protective fencing is to be installed around t e tree protection one generally in · Remove all ant ropogenic rubbis
RE 12 3 4
ll required species substitutions are to be confirmed in riting · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils accordance it 49 0 2009 prior to site establis ment and remain intact and · op dead dying or dangerous limbs or trees as required to remove risk of injury to
andscape contractor to coordinate it civil contractor to ensure topsoil is monitored and certified by t e project arborist until completion of orks users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
from council s parks branc prior to t e commence of any landscape ork
re installed per t e follo ing specifications in respective landscape areas · Refer to etail for protective fencing specifications ground surface it in regeneration ones at least 5 meters from pat s and ot er
· Clear remove all non organic deleterious and large organic matter suc as rocks · ny orks it in t e tree protection one to be supervised by t e project arborist infrastructure
greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to · ctivities it in t e tree protection one are to be aut orised and supervised by t e · ll felled vegetation is to be retained on site resultant mulc is to be used in
be landscaped project arborist No compaction from ve icles pedestrian movement stockpiling of revegetation landscaping or soil stabilisation activities
PROJECT DESCRIPTION
· E cavate and remove off site any remaining fill to turf and garden areas to ensure top soil e cavation no dumping of aste or cutting it in t e root one s is to · dd 100mm ulc to all disturbed areas
THIS WORK COMPRISES OF; occur
correct dept s for topsoils
· andscape contractor to conduct soils analyses tests to stockpiled topsoils and · ny orks carried out beneat t e canopy s of t e tree is to be supervised by t e OPERATIONS - UNDISTURBED AREAS
1) CONSTRUCTION WORKS: project arborist to ensure t at t e correct arboreal tec niques are utilised
ameliorate per recommendations prior to re spreading Furnis la it results · dentify eeds f unsure consult ll ot er vegetation to be protected and
a Retaining associated drainage
andscape contractor to allo for for p balancing nutrient ameliorations all soil retained
b nstallation of slope drainage stabilisation products VEGETATION MANAGEMENT PROTECTION PROGRAM
testing to be conducted by a lab accredited by N T · Treat all eeds and pasture grasses Refer to eed Removal c edule
c Tree protection fencing
Issue Vegetation management - clearing & protection · Remove all ant ropogenic rubbis
Cultivate · op dead dying or dangerous limbs or trees as required to remove risk of injury to
REHABILITATION OF EXISTING VEGETATION WORKS;
· Cultivate ground in all disturbed areas to a dept ere possible to 5mm dept for users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
a nstallation of supplementary trees s rubs to improve canopy e tent Objective dentify areas of vegetation individual trees to be
inspection before installation of soil reveg ground surface it in regeneration ones at least 5 meters from pat s and ot er
bio diversity protected retained it in t e development areas t ose
· voiding any root systems infrastructure
to be cleared
REVEGETATION OF DEGRADED LAND; Ensure t at orkers understand t e requirements of · ll felled vegetation is to be retained on site mulc is to be used in revegetation
Mulch landscaping or soil stabilisation activities
a nstallation of supplementary trees s rubs to create ne canopy and protection retention install protective devices to
· Organic and inorganic mulc es are required to be installed over all garden areas ensure no accidental damage occurs · dentify location for supplement planting for canopy integrity
increase bio diversity
ere s o n on t e dra ings Ensure t at clearing met ods are appropriate for areas
· ll mulc es supplied must be clean free from live eeds eed seeds specifically WEED REMOVAL SCHEDULE
2) VEGETATION MANAGEMENT & PROTECTION; being cleared especially in t e vicinity of areas to be
nutsedge pests soil borne viruses and diseases Furt er PER it certifications protected Task Operation Frequency
respectively for approval prior to installations Ensure t at t e ork program is suc as to minimise t e Remove entire plant by and lternatively kill Follo ing
3) WEED MANAGEMENT - CONSTRUCTION PHASE Herbaceous plant it erbicide application using ick iper identification of
ulc types include: time bet een en clearing occurs t e cleared ground
a eed management under e isting canopy of all oody oods and
· Forest lend ulc 100mm dept to all revegetation areas is stabilised to reduce t e c ances of silt movement and small or ooded spray no le For erbaceous eeds eeds s
reduction of erbaceous grassy eeds
· Coir es and ugar Cane To all bio basin media Ensure t at cleared material is mulc ed or ood c ipped weed control cut or scrape stem and paint it 1:1 mi of required to kill
Furt er information located in Finis es c edule and dra ings as appropriate or disposed of in an approved manner glyp osate and ater eeds
4) WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
· upply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept rill and fill or frilling erbicide is delivered into Follo ing
Tasks Ensure vegetation to be retained is correctly identified sap ood via drilled oles or frill cut pockets identification of
Large and
1. CONSTRUCTION WORKS REHABILITATION AREAS clearly marked protective devices are installed
woody weed immediately after ound is made f eeds s
PRELIMINARIES maintained in functional condition accessibility permits cut stump met od Cut required to kill
TUBESTOCK PLANTING, SETOUT & TREE GUARD control
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an egetation to be retained protected s all be as tree 30mm above ground and paint stump it eeds
· amboo stake setout of trees and s rubs for approval by PER
t ose indicated on t ese plans boundaries ll services related infrastructure nominated per plan field adjusted on site by la undiluted glyp osate
· etout to be staggered and random to account for terrain variation and replicate Protection fence s all be used to protect vegetation
including street lig ting s o n on t ese plans are indicative only natural c aracter Remove aste material containing flo ers or Follo ing
nominated for retention Fence to be as per detail Remove or
· Call dial before you dig 11 00 prior to any excavation. · nstall tubes per re abilitation sc edules densities specifications details seeds or eed species from site t at can s oot identification of
· Plan dimensions take precedence over scaled dimensions manage
· nstall tree guard in nominated location as per detail ntegrity of protection devices from pieces of plant ispose of at approved eeds s
· Prior to commencing construction orks verify in t e field dimensions levels Performance vegetative facility aste material to be covered en
· aintain as per sc edule Retained vegetation trees retained in good ealt it waste
required to kill
location of site services refer engineer s dra ings generally indicators removing from site eeds
andscape contractor to ater plantings during construction period no scars from eart orks mac inery
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting
ere discrepancies occur it in landscape documentation refer to prior to eekly inspection log by responsible person · ere furt er detail is required follo industry standards and met odologies or
provision of tender pricing or construction Trees: At end of 12 month At end of 2 yr 3 Yr Off Frequency
contact PER
· ll proposed fence alignments e cept vegetation protection fencing are to be Criteria establishment establishment maintenance
pegged by a licensed surveyor in coordination it project surveyor and maintenance and maintenance Objective Responsible person for contractor reporting to super
period period
Responsible 4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
person · T is plan as been developed to specify regeneration operations for t e e isting
SEDIMENT & EROSION CONTROL
Percentage of 95% 90% 85% aquatic one riparian area upland one
· ere applicable T e landscape contractor to implement maintain for t e ont ly for eac separable portion of contract to site
plants alive Reporting · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
contract duration best practice erosion sediment control measures in accordance construction manager
and healthy landscaping decision notice and site environmental management plan
it t e manual for erosion sediment control maroon manual good
Average height 1000mm 2000mm 3000mm ake good or replace any damage to trees or vegetation
environmental practice t e consulting civil engineers specification for erosion Corrective
t at are marked for protection and retention; reinstate OBJECTIVES
sediment control Penalties fines for non compliance ill apply Shrubs: At end of 12 month At end of 12 month Off action
protective devices 1 To en ance t e ecological value of t e locality
· nstall silt control fencing in accordance it site environmental management plan Criteria establishment establishment maintenance 2 To remove eeds and minimise future incursion
local aut ority regulations and maintenance and maintenance Objective 3 Encourage natural recruitment and regeneration
· ediment erosion control devices to be installed ere necessary as directed on period period 3. WEED MANAGEMENT - CONSTRUCTION PHASE
4 Re abilitate degraded areas
site by super · T is plan as been developed to specify regeneration operations for t e e isting
5 atisfy t e recreational requirements of residents as ell as t e ecological
· ll sediment erosion control devices are to be installed in accordance it Percentage of 95% 90% 85% aquatic one riparian area upland one
plants alive requirements of a flora and fauna reserve
manufacturer s specifications · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· T e contractor is responsible for ensuring sediment erosion control devices are and healthy landscaping decision notice and site environmental management plan
· From practical completion all maintenance activities as per follo ing sc edule need
inspected maintained as follo s;
Average height to be conducted until project completion
uring construction: aily during dry eat er 400mm 1000mm 1200mm OBJECTIVES
or width
Prior to predicted storm events 1 To en ance t e ecological value of t e locality
T ice daily during prolonged rain 2 To remove eeds and minimise future incursion
2. VEGETATION MANAGEMENT & PROTECTION
3 Encourage natural recruitment and regeneration
· Native vegetation e ists on site n order to ma imise t e retained ecological values
uring establis ment period: eekly during dry eat er 4 Re abilitate degraded areas
for t e site nominated e isting vegetation requires protection management
Prior to predicted storm events 5 atisfy t e recreational requirements of residents as ell as t e ecological
· Natural vegetation regeneration needs to be encouraged
T ice eekly during prolonged rain requirements of a flora and fauna reserve
· ite eed removal is important to allo regeneration
· ll stockpiles are to be protected it suitable erosion control devices graded to
· egetation to be protected is plan nominated predominately native species in a
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 2 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 GENERAL NOTES -
Page 3
WEED DISTRIBUTION TABLE:
T e follo ing eed istribution table lists of eeds found on site priority control
recommendations and occurance of eeds Refer to Planting Plans for Weed
Locations. RIPARIAN BUFFER AREA & WATERWAY AS PER NOOSA PLAN 2020 INTERACTIVE MAPS
VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
TASK FREQUENCY PERFORMANCE INDICATOR
Brushcutting / Every 2 eeks from October arc Regenerating plants and
Slashing Every 4 eeks from pril eptember revegetation areas free from
competition it grass Remove
trim over anging branc es
t at interfere it brus cutting
slas ing
Weeding - by Every eek during inimal regro t of eeds No
hand Establis ment Period Every competition from unc ecked
2 eeks during aintenance eed and grass regro t
Period beyond Remove all no ious ig risk
environmental eeds
Spraying / Every 2 eeks from October No eeds or grass of greater 15 JIRRIMA CR
Wick Wiping arc Every 4 eeks from eig t t an plant it in 500mm
pril eptember se a of plants Remove all no ious
Pre emergent erbicide if site is ig risk environmental eeds
eavily eed infested C eck mo ing edge around site
re spray if required
Re-mulching llo to carry out at least once during niform 100mm deep to
aintenance Period t en once per suppress eed gro t
year maintain soil moisture
Watering Every 2 or 3 days during Plants e ibit ealt y gro t
Establis ment Period every eek no signs of ater stress
during aintenance Period or as
required to maintain adequate soil
moisture LEGEND
Fertilising s required ere en plants are Plants e ibit ealt y gro t
EXISTING VEGETATION OUTSIDE OF
not responding to slo release no signs of ater stress
RIPARIAN ZONE
fertiliser applied at planting llo to Refer to Plans & Notes
fertilise once during aintenance 3x Tube dia.
Period REHABILITATION ZONE 1
Storm Damage Follo ing storm event eavy rainfall ny damage noted rectified Refer to Plans, General Notes & Planting Schedule
Inspection or ig inds
TUBESTOCK PLANT, REFER TO PLANT
Pruning & To promote ealt y plant gro t Plants ave desired natural REHABILITATION ZONE 2
SCHEDULE FOR SPECIES
Plant Refer to Plans, General Notes & Planting Schedule
ont ly during Establis ment form display ealt y gro t
Maintenance Period Every 3 mont s during Remove vines from young FORM SHALLOW SAUCER SHAPED
aintenance Period beyond plants DEPRESSION AROUND PLANT BASE
REHABILITATION ZONE 3
100mm DEEP ORGANIC MULCH PER AS Refer to Plans, General Notes & Planting Schedule
Rubbish s required or after flood event ll litter removed disposed of
SPECIFIED. KEEP MINIMUM 50mm
properly off site Organic flood CLEAR OF PLANT STEM. DO NOT
debris in trees it in reac MULCH BIO-AREA MEDIA SAND. EXISTING FOREST MANAGEMENT AREA 1
en standing to be removed Refer to Plans, General Notes & Planting Schedule
spread on site
CULTIVATED SUBGRADE TO 150mm
Supplementary s required Replace dead dying EXISTING FOREST MANAGEMENT AREA 2
Planting damaged or stolen plants Refer to Plans, General Notes & Planting Schedule
TOPSOIL AS SPECIFIED
EXISTING FOREST MANAGEMENT AREA 3
Refer to Plans, General Notes & Planting Schedule
5 gram 'AGRIFORM' TABLET - USE
PHOSPHORUS FREE TABLETS FOR
CALLISTEMONS & GREVILLEAS
EXISTING FOREST MANAGEMENT AREA 4
SUBGRADE Refer to Plans, General Notes & Planting Schedule
CCE RE TR CT ON FENCE
F1
T R P C ET O E
1 TUBESTOCK PLANTING
LP3 Typical Section N.T.S. TREES TO BE REMOVED
Refer to Plan & Notes
TREES OFFSET
FINISHES SCHEDULE Refer to Plan, Detail, Notes, Plant Schedule 4
& Finishes Schedule
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
Top oil oil preparation s moot uniform eed free
meliorated site topsoil: Refer to RIPARIAN BUFFER AREA
Top soil per pecification per plan topsoil mulc surfaces it no s supplied
specifications Refer to Plans & General Notes
nominated areas deleterious materials
niform finis 100mm deep free of deleterious
F Organic ulc treet Tree garden pt and gardens 25mm composted materials nstall pinned coir mes over bio retention s supplied CENTRE LINE OF CREEK WATERWAY
Composted Forest itter basic mulc areas project entry batter and Refer to Plans & General Notes
storm ater overland flo pat lo flo s ales
PROPERTY BOUNDARY
Refer to Plans & General Notes
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
SCHEDULE OF
FINISHES,
SHEET 3 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SPECIFICATION NOTES - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 & TYPICAL DETAIL -
Page 4
TREE OFFSET PLANTING
OFFSET TABLE
RE 12 3 4 OFFSET RATIO TREES REMOVED TREES OFFSET AREA OF OFFSET
Open forest to oodland of elaleuca quinquenervia and
SOUTHERN
Eucalyptus robusta Occurs fringing drainage lines and on 1:1 5 5
BOUNDARY
floodplains in coastal areas 1 : 22a
PLANT SCHEDULE 1
- RE 12.3.4
- Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium
Code GENUS species - Common Name Quantity
Trees @ 1/25m²
E qui E E C quinquenervia 5
TOTAL 5
TREES & UNDERSTOREY REHABILITATION
PLANT SCHEDULE 2 PLANT SCHEDULE 3 PLANT SCHEDULE 4
REHABILITATION ZONE 1 REHABILITATION ZONE 2 REHABILITATION ZONE 3
- Trees & Understorey Rehabilitation - Trees & Understorey Rehabilitation - Trees & Understorey Rehabilitation
- RE 12.3.4 - RE 12.3.4 - RE 12.3.4
- Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium
- Total Approx Area: 2529 m² - Total Approx Area: 1167 m² - Total Approx Area: 1701 m²
Code GENUS species - Common Name Quantity Code GENUS species - Common Name Quantity Code GENUS species - Common Name Quantity
Trees @ 1/9m² Trees @ 1/9m² Trees @ 1/9m²
lit OC R N littoralis lack eoak 4 lit OC R N littoralis lack eoak 22 lit OC R N littoralis lack eoak 31
C gla C R N glauca amp s e oak 4 C gla C R N glauca amp s e oak 22 C gla C R N glauca amp s e oak 31
C sal C TE ON salignus llo ottlebrus 4 C sal C TE ON salignus llo ottlebrus 22 C sal C TE ON salignus llo ottlebrus 31
E C rob E C PT robusta amp a ogany 4 E C rob E C PT robusta amp a ogany 22 E C rob E C PT robusta amp a ogany 31
E qui E E C quinquenervia road leaved Paperbark 4 E qui E E C quinquenervia road leaved Paperbark 22 E qui E E C quinquenervia road leaved Paperbark 31
E lin E E C linariifolia no in summer 4 E lin E E C linariifolia no in summer 22 E lin E E C linariifolia no in summer 31
TOTAL 282 TOTAL 132 TOTAL 186
Groundcover Groundcover Groundcover
P cyl PER T cylindrica 2 m2 1 8 P cyl PER T cylindrica 2 m2 8 P cyl PER T cylindrica 2 m2 1134
O ys O N R ystri 1 1 5m2 5 2 O ys O N R ystri 1 1 5m2 2 0 O ys O N R ystri 1 1 5m2 3 8
T E tri T E E triandra 1 m2 843 T E tri T E E triandra 1 m2 389 T E tri T E E triandra 1 m2 5
TOTAL 3091 TOTAL 1427 TOTAL 2079
SUPPLIMENTARY TREES & UNDERSTOREY REHABILITATION
PLANT SCHEDULE 5 PLANT SCHEDULE 6 PLANT SCHEDULE 7 PLANT SCHEDULE 8
EXISTING FOREST MANAGEMENT AREA 1 EXISTING FOREST MANAGEMENT AREA 2 EXISTING FOREST MANAGEMENT AREA 3 EXISTING FOREST MANAGEMENT AREA 3
- Supplementary Trees & Understorey Rehabilitation - Supplementary Trees & Understorey Rehabilitation - Supplementary Trees & Understorey Rehabilitation - Supplementary Trees & Understorey Rehabilitation
- RE 12.3.4 - RE 12.3.4 - RE 12.3.4 - RE 12.3.4
- Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal
- Total Approx Area: 3313 m² - Total Approx Area: 665 m² - Total Approx Area: 662 m² alluvium
- Total Approx Area: 297 m²
Code GENUS species - Common Name Quantity Code GENUS species - Common Name Quantity Code GENUS species - Common Name Quantity
Code GENUS species - Common Name Quantity
Trees @ 1/25m² Trees @ 1/25m² Trees @ 1/25m²
lit OC R N littoralis lack eoak 22 lit OC R N littoralis lack eoak 4 lit OC R N littoralis lack eoak 4 Trees @ 1/25m²
C gla C R N glauca amp s e oak 22 C gla C R N glauca amp s e oak 4 C gla C R N glauca amp s e oak 4 lit OC R N littoralis lack eoak 2
C sal C TE ON salignus llo ottlebrus 22 C sal C TE ON salignus llo ottlebrus 4 C sal C TE ON salignus llo ottlebrus 4 C gla C R N glauca amp s e oak 2
E C rob E C PT robusta amp a ogany 22 E C rob E C PT robusta amp a ogany 4 E C rob E C PT robusta amp a ogany 4 C sal C TE ON salignus llo ottlebrus 2
E qui E E C quinquenervia road leaved Paperbark 22 E qui E E C quinquenervia road leaved Paperbark 4 E qui E E C quinquenervia road leaved Paperbark 4 E C rob E C PT robusta amp a ogany 2
E lin E E C linariifolia no in summer 22 E lin E E C linariifolia no in summer 4 E lin E E C linariifolia no in summer 4 E qui E E C quinquenervia road leaved Paperbark 2
TOTAL 132 TOTAL 24 TOTAL 24 E lin E E C linariifolia no in summer 2
TOTAL 12
GROUNDCOVER 12 PO 10m2 Groundcover 100% Of area Groundcover 100% Of area
P cyl PER T cylindrica 2 m2 P cyl PER T cylindrica 2 m2 443 P cyl PER T cylindrica 2 m2 443 Groundcover 100% Of area
O ys O N R ystri 1 1 5m2 2 O ys O N R ystri 1 1 5m2 14 O ys O N R ystri 1 1 5m2 14 P cyl PER T cylindrica 2 m2 198
T E tri T E E triandra 1 m2 3 T E tri T E E triandra 1 m2 221 T E tri T E E triandra 1 m2 221 O ys O N R ystri 1 1 5m2
SUB TOTAL 11 TOTAL 811 TOTAL 811 T E tri T E E triandra 1 m2 99
TOTAL 132 TOTAL 363
Client Project TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LD4
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 4 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 PLANT SCHEDULES -
Page 5
E TN FORE T N E ENT RE 1
EE CONTRO RE RE
N RT RE OF E ER N N T E RE RO T
ON TOR N E RE
REFER TO P NT C E E5 CENTRE NE OF CREE TER
PROPERT O N R
F1
OT O N R
RO N CO ER PO
F1
REFER TO P NT C E E 5 roundcovers
F1
F1
F1
RE T T ON ONE 1
REFER TO P NT C E E2
F1
CCE RE TR CT ON FENCE
T R P C ET O E
OT 2 OT 1
F1
RR
F1
CR
F1
F1
1 E qui 1 E qui 1 E qui 1 E qui 1 E qui RP R N FFER RE
F1
F1
E T PROPO E R E R E
PROPERT O N R
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LP1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
0 2.5 5 7.5 10 12.5 SHEET 5 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SCALE 1:500 @ A3 SCALE 1:250 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:500 @A3
Page 6
PROPERT O N R
TER
RP R N FFER RE
RE T T ON ONE 2
REFER TO P NT C E E3
E TN FORE T N E ENT RE 2
EE CONTRO RE RE
N RT RE OF E ER N N T E RE RO T
ON TOR N E RE PROPO E E
REFER TO P NT C E E
OT 2
RE T T ON ONE 3
REFER TO P NT C E E4
E TN FORE T N E ENT RE 3
EE CONTRO RE RE
N RT RE OF E ER N N T E RE RO T
ON TOR N E RE
REFER TO P NT C E E PROPO E PR NC P E RE ENCE
E TN FORE T N E ENT RE 4
PROPO E R E R E
EE CONTRO RE RE
N RT RE OF E ER N N T E RE RO T
ON TOR N E RE
REFER TO P NT C E E8
PROPERT O N R
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
0 2.5 5 7.5 10 12.5 SHEET 6 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SCALE 1:500 @ A3 SCALE 1:250 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:500 @A3