Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Landscape and Rehabilitation Plan

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
N    Not applicable                                            OC On centre
 P    aintenace Period                                         m2 quare metres
m3 Cubic etres                                                 T P Typical                      ·  ll stockpiles are to be protected it suitable erosion control devices graded to                           ·  egetation to be protected is plan nominated predominately native species in a                          PRELIMINARIES
                                                                                                  ensure control of runoff                                                                                      ealt y safe condition t at are not located so as to interfere it required                              · efore ork commences t e PER is to organise a pre start meeting it t e
N T National ssociation of Testing ut orities                    PER uperintendent
uP C    nplasticised polyvinyl C loride Pipe                   N C Noosa ire Council            · Coordinate installation of sediment erosion control devices it civil contractor to                           approved site orks                                                                                        landscape arc itect and CC environment landscape officer to establis scope of
                                                                                                  ensure compatibility consistency in control measures                                                       · T e follo ing table summari es t e vegetation management program elements;                                  orks management procedures and clarify any issues
        ater by esign                                            O andscape ssessment Officer
                                                                                                · ll e posed surfaces once completed s all be immediately stabili ed to prevent                                                                                                                                        ·    ere any discrepancies occur refer to
                                                                                                  erosion                                                                                                    TREE PROTECTION MEASURES
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE
                                                                                                                                                                                                             · T e follo ing tree protection measures must at all times be ad ered to during any
· part from declared eeds all e isting vegetation s all be retained as been                                                                                                                                                                                                                                            OPERATIONS - DISTURBED AREAS
                                                                                                EDGING                                                                                                         on site orks generally in accordance it          49 0 2009 protection of trees on                       · dentify eeds f unsure consult           ll ot er vegetation to be protected and
  identified it retention protection measures for suc are nominated erein
                                                                                                 pade Edge                                                                                                     development sites          ill advise ere measures are required at Pre start but is
· dentified areas are confined to areas of eed management t ose nominated on                                                                                                                                                                                                                                             retained
  t ese plans it associated orks described erein                                                · nstall pade Cut edge as located on plans          as per detail                                              generally to standard s of e isting trees t at are s o n as re abilitation areas                        · Treat all eeds and pasture grasses Refer to eed Removal c edule
                                                                                                                                                                                                             · Prior to commencement of orks t e contractor to organise a pre construction                             · ecompact ground and cultivate to 5mm deep
· Plant sc edules are as per;
                                                                                                REVEGETATION AREAS                                                                                             meeting to identify trees for protection removal and or pruning                                         · rade ground surface to create smoot falls a ay from pat s ere necessary
                                                                                                Soil                                                                                                         · Protective fencing is to be installed around t e tree protection one generally in                       · Remove all ant ropogenic rubbis
              RE 12 3 4
                ll required species substitutions are to be confirmed in riting                 · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils                              accordance it         49 0 2009 prior to site establis ment and remain intact and                       · op dead dying or dangerous limbs or trees as required to remove risk of injury to
                                                                                                   andscape contractor to coordinate it civil contractor to ensure topsoil is                                  monitored and certified by t e project arborist until completion of orks                                  users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
              from council s parks branc prior to t e commence of any landscape ork
                                                                                                  re installed per t e follo ing specifications in respective landscape areas                                · Refer to etail for protective fencing specifications                                                      ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                                · Clear remove all non organic deleterious and large organic matter suc as rocks                             · ny orks it in t e tree protection one to be supervised by t e project arborist                            infrastructure
                                                                                                  greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to                            · ctivities it in t e tree protection one are to be aut orised and supervised by t e                      · ll felled vegetation is to be retained on site resultant mulc is to be used in
                                                                                                  be landscaped                                                                                                project arborist No compaction from ve icles pedestrian movement stockpiling of                           revegetation landscaping or soil stabilisation activities
PROJECT DESCRIPTION
                                                                                                · E cavate and remove off site any remaining fill to turf and garden areas to ensure                           top soil e cavation no dumping of aste or cutting it in t e root one s is to                            · dd 100mm ulc to all disturbed areas
 THIS WORK COMPRISES OF;                                                                                                                                                                                       occur
                                                                                                  correct dept s for topsoils
                                                                                                · andscape contractor to conduct soils analyses tests to stockpiled topsoils and                             · ny orks carried out beneat t e canopy s of t e tree is to be supervised by t e                          OPERATIONS - UNDISTURBED AREAS
    1)        CONSTRUCTION WORKS:                                                                                                                                                                              project arborist to ensure t at t e correct arboreal tec niques are utilised
                                                                                                  ameliorate per recommendations prior to re spreading Furnis la it results                                                                                                                                            · dentify eeds f unsure consult             ll ot er vegetation to be protected and
              a Retaining associated drainage
                                                                                                   andscape contractor to allo for for p balancing nutrient ameliorations all soil                                                                                                                                       retained
              b nstallation of slope drainage stabilisation products                                                                                                                                         VEGETATION MANAGEMENT PROTECTION PROGRAM
                                                                                                  testing to be conducted by a lab accredited by N T                                                                                                                                                                   · Treat all eeds and pasture grasses Refer to eed Removal c edule
              c Tree protection fencing
                                                                                                                                                                                                                 Issue                        Vegetation management - clearing & protection                            · Remove all ant ropogenic rubbis
                                                                                                Cultivate                                                                                                                                                                                                              · op dead dying or dangerous limbs or trees as required to remove risk of injury to
              REHABILITATION OF EXISTING VEGETATION WORKS;
                                                                                                · Cultivate ground in all disturbed areas to a dept         ere possible to 5mm dept for                                                                                                                                 users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
              a nstallation of supplementary trees s rubs to improve canopy e tent                                                                                                                            Objective                          dentify areas of vegetation individual trees to be
                                                                                                  inspection before installation of soil reveg                                                                                                                                                                           ground surface it in regeneration ones at least 5 meters from pat s and ot er
               bio diversity                                                                                                                                                                                                                    protected retained it in t e development areas t ose
                                                                                                · voiding any root systems                                                                                                                                                                                               infrastructure
                                                                                                                                                                                                                                                to be cleared
              REVEGETATION OF DEGRADED LAND;                                                                                                                                                                                                    Ensure t at orkers understand t e requirements of                      · ll felled vegetation is to be retained on site mulc is to be used in revegetation
                                                                                                Mulch                                                                                                                                                                                                                    landscaping or soil stabilisation activities
              a nstallation of supplementary trees s rubs to create ne canopy and                                                                                                                                                               protection retention install protective devices to
                                                                                                · Organic and inorganic mulc es are required to be installed over all garden areas                                                              ensure no accidental damage occurs                                     · dentify location for supplement planting for canopy integrity
              increase bio diversity
                                                                                                     ere s o n on t e dra ings                                                                                                                  Ensure t at clearing met ods are appropriate for areas
                                                                                                · ll mulc es supplied must be clean free from live eeds eed seeds specifically                                                                                                                                         WEED REMOVAL SCHEDULE
    2)        VEGETATION MANAGEMENT & PROTECTION;                                                                                                                                                                                               being cleared especially in t e vicinity of areas to be
                                                                                                  nutsedge pests soil borne viruses and diseases Furt er       PER it certifications                                                            protected                                                                  Task                       Operation                                    Frequency
                                                                                                  respectively for approval prior to installations                                                                                              Ensure t at t e ork program is suc as to minimise t e                                                 Remove entire plant by and lternatively kill Follo ing
    3)        WEED MANAGEMENT - CONSTRUCTION PHASE                                                                                                                                                                                                                                                                         Herbaceous                 plant it erbicide application using ick iper identification of
                                                                                                  ulc types include:                                                                                                                            time bet een en clearing occurs t e cleared ground
              a eed management under e isting canopy of all oody oods and
                                                                                                · Forest lend ulc 100mm dept to all revegetation areas                                                                                          is stabilised to reduce t e c ances of silt movement                       and small                  or ooded spray no le For erbaceous eeds eeds s
              reduction of erbaceous grassy eeds
                                                                                                · Coir es and ugar Cane To all bio basin media                                                                                                  Ensure t at cleared material is mulc ed or ood c ipped                     weed control               cut or scrape stem and paint it 1:1 mi of    required to kill
                                                                                                Furt er information located in Finis es c edule and dra ings                                                                                    as appropriate or disposed of in an approved manner                                                   glyp osate and ater                            eeds
    4)        WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
                                                                                                · upply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept                                                                                                                                                                         rill and fill or frilling erbicide is delivered into Follo ing
                                                                                                                                                                                                                 Tasks                           Ensure vegetation to be retained is correctly identified                                            sap ood via drilled oles or frill cut pockets          identification of
                                                                                                                                                                                                                                                                                                                           Large and
1. CONSTRUCTION WORKS                                                                           REHABILITATION AREAS                                                                                                                             clearly marked protective devices are installed
                                                                                                                                                                                                                                                                                                                           woody weed                immediately after ound is made f                         eeds s
PRELIMINARIES                                                                                                                                                                                                                                    maintained in functional condition                                                                  accessibility permits cut stump met od Cut             required to kill
                                                                                                TUBESTOCK PLANTING, SETOUT & TREE GUARD                                                                                                                                                                                    control
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an                                                                                                                                                              egetation to be retained protected s all be as                                                     tree 30mm above ground and paint stump it                eeds
                                                                                                · amboo stake setout of trees and s rubs for approval by PER
  t ose indicated on t ese plans       boundaries ll services related infrastructure                                                                                                                                                             nominated per plan field adjusted on site by la                                                     undiluted glyp osate
                                                                                                · etout to be staggered and random to account for terrain variation and replicate                                                                Protection fence s all be used to protect vegetation
  including street lig ting s o n on t ese plans are indicative only                              natural c aracter                                                                                                                                                                                                                                  Remove aste material containing flo ers or                 Follo ing
                                                                                                                                                                                                                                                 nominated for retention Fence to be as per detail                         Remove or
· Call dial before you dig 11 00 prior to any excavation.                                       · nstall tubes per re abilitation sc edules densities specifications details                                                                                                                                                                         seeds or eed species from site t at can s oot              identification of
· Plan dimensions take precedence over scaled dimensions                                                                                                                                                                                                                                                                   manage
                                                                                                · nstall tree guard in nominated location as per detail                                                                                          ntegrity of protection devices                                                                      from pieces of plant ispose of at approved                   eeds s
· Prior to commencing construction orks verify in t e field dimensions levels                                                                                                                                    Performance                                                                                               vegetative                facility aste material to be covered en
                                                                                                · aintain as per sc edule                                                                                                                        Retained vegetation trees retained in good ealt                it         waste
                                                                                                                                                                                                                                                                                                                                                                                                                required to kill
  location of site services refer engineer s dra ings generally                                                                                                                                                  indicators                                                                                                                          removing from site                                           eeds
                                                                                                 andscape contractor to ater plantings during construction period                                                                                no scars from eart orks mac inery
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans           VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting
      ere discrepancies occur it in landscape documentation refer to        prior to                                                                                                                                                            eekly inspection           log by responsible person                   ·      ere furt er detail is required follo industry standards and met odologies or
  provision of tender pricing or construction                                                       Trees:               At end of 12 month At end of 2 yr                      3 Yr Off                         Frequency
                                                                                                                                                                                                                                                                                                                           contact     PER
· ll proposed fence alignments e cept vegetation protection fencing are to be                       Criteria             establishment      establishment                       maintenance
  pegged by a licensed surveyor in coordination it project surveyor                                                      and maintenance    and maintenance                     Objective                                                     Responsible person for contractor reporting to super
                                                                                                                         period             period
                                                                                                                                                                                                                 Responsible                                                                                           4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
                                                                                                                                                                                                                 person                                                                                                · T is plan as been developed to specify regeneration operations for t e e isting
SEDIMENT & EROSION CONTROL
                                                                                                    Percentage of        95%                        90%                         85%                                                                                                                                        aquatic one riparian area              upland one
·     ere applicable T e landscape contractor to implement maintain for t e                                                                                                                                                                    ont ly for eac separable portion of contract to site
                                                                                                    plants alive                                                                                                 Reporting                                                                                             · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
  contract duration best practice erosion sediment control measures in accordance                                                                                                                                                             construction manager
                                                                                                    and healthy                                                                                                                                                                                                            landscaping decision notice and site environmental management plan
    it t e manual for erosion sediment control maroon manual good
                                                                                                    Average height       1000mm                     2000mm                      3000mm                                                          ake good or replace any damage to trees or vegetation
  environmental practice t e consulting civil engineers specification for erosion                                                                                                                                Corrective
                                                                                                                                                                                                                                              t at are marked for protection and retention; reinstate                  OBJECTIVES
  sediment control Penalties fines for non compliance ill apply                                  Shrubs:                 At end of 12 month At end of 12 month                  Off                              action
                                                                                                                                                                                                                                              protective devices                                                       1 To en ance t e ecological value of t e locality
· nstall silt control fencing in accordance it site environmental management plan                Criteria                establishment      establishment                       maintenance                                                                                                                            2 To remove eeds and minimise future incursion
  local aut ority regulations                                                                                            and maintenance    and maintenance                     Objective                                                                                                                              3 Encourage natural recruitment and regeneration
· ediment erosion control devices to be installed ere necessary as directed on                                           period             period                                                           3. WEED MANAGEMENT - CONSTRUCTION PHASE
                                                                                                                                                                                                                                                                                                                       4 Re abilitate degraded areas
  site by super                                                                                                                                                                                              · T is plan as been developed to specify regeneration operations for t e e isting
                                                                                                                                                                                                                                                                                                                       5    atisfy t e recreational requirements of residents as ell as t e ecological
· ll sediment erosion control devices are to be installed in accordance it                          Percentage of        95%                        90%                         85%                              aquatic one riparian area                 upland one
                                                                                                    plants alive                                                                                                                                                                                                          requirements of a flora and fauna reserve
  manufacturer s specifications                                                                                                                                                                              · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· T e contractor is responsible for ensuring sediment erosion control devices are                   and healthy                                                                                                  landscaping decision notice and site environmental management plan
                                                                                                                                                                                                                                                                                                                       · From practical completion all maintenance activities as per follo ing sc edule need
  inspected maintained as follo s;
                                                                                                    Average height                                                                                                                                                                                                         to be conducted until project completion
               uring construction:                   aily during dry eat er                                              400mm                      1000mm                      1200mm                       OBJECTIVES
                                                                                                    or width
                                                    Prior to predicted storm events                                                                                                                          1 To en ance t e ecological value of t e locality
                                                    T ice daily during prolonged rain                                                                                                                        2 To remove eeds and minimise future incursion
                                                                                                2. VEGETATION MANAGEMENT & PROTECTION
                                                                                                                                                                                                             3 Encourage natural recruitment and regeneration
                                                                                                · Native vegetation e ists on site n order to ma imise t e retained ecological values
                    uring establis ment period:         eekly during dry eat er                                                                                                                              4 Re abilitate degraded areas
                                                                                                    for t e site nominated e isting vegetation requires protection       management
                                                      Prior to predicted storm events                                                                                                                        5    atisfy t e recreational requirements of residents as ell as t e ecological
                                                                                                · Natural vegetation regeneration needs to be encouraged
                                                      T ice eekly during prolonged rain                                                                                                                         requirements of a flora and fauna reserve
                                                                                                · ite eed removal is important to allo regeneration
·     ll stockpiles are to be protected it suitable erosion control devices graded to
                                                                                                · egetation to be protected is plan nominated predominately native species in a

Client                                                                      Project                                                                                                                                                                                   NORTH                            TITLE:                     JOB No.: S21091111
                                                                                                                                                                                                                                                                                                                                                                                 anembo consultants
                                                                                                                                                                                                                                                                                                                                  FILE:   211013
Rhiana Magee                                                               15 Jirrima Cr, Cooroibah                                                                                                                                                                                                                               DWG. No.     LD2
                                                                                                                                                                                                                                                                                                                                                                                 Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                 Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                     Project Management


This document is the copyright of anembo consultants & shall
                                                                           LANDSCAPE REHABILITATION                                                                                                                      B   13.10.21 COUNCIL SUBMISSION    CK   TH                                                            SHEET         2 OF 6                              anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                 Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                   A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                               Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                                           & OPERATIONAL WORKS PLAN                                                                                                                      A   22.09.21    FOR REVIEW         CK   TH                                                               -                                              Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                              email: [email protected]                www.anembo.com
                                                                                                                                     ISSUE   DATE    DESCRIPTION    DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE      DATE      DESCRIPTION        DRWN CKD   APPROVED:   T Hindley ALIA 713   GENERAL NOTES              -
Log in to download the original file

Landscape and Rehabilitation Plan.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.