Original source · versioned page text
Landscape and Rehabilitation Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn WEED DISTRIBUTION TABLE:
T e follo ing eed istribution table lists of eeds found on site priority control
recommendations and occurance of eeds Refer to Planting Plans for Weed
Locations. RIPARIAN BUFFER AREA & WATERWAY AS PER NOOSA PLAN 2020 INTERACTIVE MAPS
VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
TASK FREQUENCY PERFORMANCE INDICATOR
Brushcutting / Every 2 eeks from October arc Regenerating plants and
Slashing Every 4 eeks from pril eptember revegetation areas free from
competition it grass Remove
trim over anging branc es
t at interfere it brus cutting
slas ing
Weeding - by Every eek during inimal regro t of eeds No
hand Establis ment Period Every competition from unc ecked
2 eeks during aintenance eed and grass regro t
Period beyond Remove all no ious ig risk
environmental eeds
Spraying / Every 2 eeks from October No eeds or grass of greater 15 JIRRIMA CR
Wick Wiping arc Every 4 eeks from eig t t an plant it in 500mm
pril eptember se a of plants Remove all no ious
Pre emergent erbicide if site is ig risk environmental eeds
eavily eed infested C eck mo ing edge around site
re spray if required
Re-mulching llo to carry out at least once during niform 100mm deep to
aintenance Period t en once per suppress eed gro t
year maintain soil moisture
Watering Every 2 or 3 days during Plants e ibit ealt y gro t
Establis ment Period every eek no signs of ater stress
during aintenance Period or as
required to maintain adequate soil
moisture LEGEND
Fertilising s required ere en plants are Plants e ibit ealt y gro t
EXISTING VEGETATION OUTSIDE OF
not responding to slo release no signs of ater stress
RIPARIAN ZONE
fertiliser applied at planting llo to Refer to Plans & Notes
fertilise once during aintenance 3x Tube dia.
Period REHABILITATION ZONE 1
Storm Damage Follo ing storm event eavy rainfall ny damage noted rectified Refer to Plans, General Notes & Planting Schedule
Inspection or ig inds
TUBESTOCK PLANT, REFER TO PLANT
Pruning & To promote ealt y plant gro t Plants ave desired natural REHABILITATION ZONE 2
SCHEDULE FOR SPECIES
Plant Refer to Plans, General Notes & Planting Schedule
ont ly during Establis ment form display ealt y gro t
Maintenance Period Every 3 mont s during Remove vines from young FORM SHALLOW SAUCER SHAPED
aintenance Period beyond plants DEPRESSION AROUND PLANT BASE
REHABILITATION ZONE 3
100mm DEEP ORGANIC MULCH PER AS Refer to Plans, General Notes & Planting Schedule
Rubbish s required or after flood event ll litter removed disposed of
SPECIFIED. KEEP MINIMUM 50mm
properly off site Organic flood CLEAR OF PLANT STEM. DO NOT
debris in trees it in reac MULCH BIO-AREA MEDIA SAND. EXISTING FOREST MANAGEMENT AREA 1
en standing to be removed Refer to Plans, General Notes & Planting Schedule
spread on site
CULTIVATED SUBGRADE TO 150mm
Supplementary s required Replace dead dying EXISTING FOREST MANAGEMENT AREA 2
Planting damaged or stolen plants Refer to Plans, General Notes & Planting Schedule
TOPSOIL AS SPECIFIED
EXISTING FOREST MANAGEMENT AREA 3
Refer to Plans, General Notes & Planting Schedule
5 gram 'AGRIFORM' TABLET - USE
PHOSPHORUS FREE TABLETS FOR
CALLISTEMONS & GREVILLEAS
EXISTING FOREST MANAGEMENT AREA 4
SUBGRADE Refer to Plans, General Notes & Planting Schedule
CCE RE TR CT ON FENCE
F1
T R P C ET O E
1 TUBESTOCK PLANTING
LP3 Typical Section N.T.S. TREES TO BE REMOVED
Refer to Plan & Notes
TREES OFFSET
FINISHES SCHEDULE Refer to Plan, Detail, Notes, Plant Schedule 4
& Finishes Schedule
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
Top oil oil preparation s moot uniform eed free
meliorated site topsoil: Refer to RIPARIAN BUFFER AREA
Top soil per pecification per plan topsoil mulc surfaces it no s supplied
specifications Refer to Plans & General Notes
nominated areas deleterious materials
niform finis 100mm deep free of deleterious
F Organic ulc treet Tree garden pt and gardens 25mm composted materials nstall pinned coir mes over bio retention s supplied CENTRE LINE OF CREEK WATERWAY
Composted Forest itter basic mulc areas project entry batter and Refer to Plans & General Notes
storm ater overland flo pat lo flo s ales
PROPERTY BOUNDARY
Refer to Plans & General Notes
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 211013
Rhiana Magee 15 Jirrima Cr, Cooroibah DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
SCHEDULE OF
FINISHES,
SHEET 3 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SPECIFICATION NOTES - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 & TYPICAL DETAIL -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.