Development Application part 2 of 2
Place Barcode here liijii~iii 80495437
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part ~ Of d-
Application number: O.pvJ \;;.-(c!)d-"1,7
C:\Oocuments and Senings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
(3}.doc
Development Counter
",
2 1 AUG 2012 IB~~~;?~~.~Q". ""...I.~.~J
R:
Maroochydore
-
-’"
.__
--_
[OCR of page images]
—
Place Barcode here
Part = of -
SCRC CORRESPONDENC:
NTNU
B0495437
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
0 p | a)
Application number: Wid} 0
| Development Counter
2 1 AUG 2012
Maroochydore
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application part 2 of 2.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 10 pages
Page 2
i- -
\
~Queensland
~)’~ Governmen.t
26 July 2012
Department of
Transport and Main Roads
Vasard Marine
169 First Avenue
Bribie Island Qld 4507
Dear Sir
Tidal Works -
Request for comments
Pontoon -
J Alizzi, 10 Noosa Parade,Noosa Heads (Lot4 RP183112)
Thank you for your letter 27 June 2012 about your proposal to construct a pontoon at the location
mentioned above.
As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.
1. The contractor must build the pontoon according to Vasard Marine Pty Ltd, drawing SP-404/1,
attached to your letter dated 27 June 2012.
2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.
3. In the absence of a designated quayline, the structure and any part thereof must not extend beyond
that ofneighbouring approved structures.
4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.
5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.
Department of Transport and Main Roads Our ref 215/01638 P14840-MOM P14872-MOM
Maritime Safety Queensland Your ref
Marine Operations (Brisbane) Enquiries Geoff Prendergast
MacArthur Avenue East Telephone +61 7 38603504
Pinkenba Queensland 4008 Facsimile +61 738603571
Website www.msq.qld.gov.au
Email [email protected]
[OCR of page images]
Queensland
Government
26 July 2012
Department of
. Transport and Main Roads
Vasard Marine
169 First Avenue
Bribie Island Qid 4507
Dear Sir
Tidal Works — Request for comments
Pontoon — J Alizzi, 10 Noosa Parade, Noosa Heads (Lot 4 RP183112)
Thank you for your letter 27 June 2012 about your proposal to construct a pontoon at the location
mentioned above.
As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.
1. The contractor must build the pontoon according to Vasard Marine Pty Ltd, drawing SP-404/1,
attached to your letter dated 27 June 2012.
2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.
3. Inthe absence of a designated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures.
4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.
5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.
Department of Transport and Main Roads Our ref 215/01638 P14840-MOM P14872-MOM
Maritime Safety Queensland Your ref
Marine Operations (Brisbane) Enquiries Geoff Prendergast
MacArthur Avenue East Telephone +61 7 3860 3504
Pinkenba Queensland 4008 ‘ Facsimile +61 7 3860 3571
Website www.msgq.qid.gov.au
Email [email protected]
Page 3
’/
7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages oftide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
8. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994,the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (MarinePollution)Act 1995.
9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (MarineSafety) Regulation 2004.
10. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.
11. Any ship, dry berth or device (including Air Lifting Pontoons)berthed, moored or attached to the
pontoon must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall -
10 metres N/A
Beam- 4.5 metres
12. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
.,.p""
qJ~
-
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
[OCR of page images]
7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
8. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
10. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.
11. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
pontoon must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall- 10 metres N/A
Beam - 4.5 metres
12. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
‘bf?
pene,
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
Page 4
—
%P183112 VO Page 1 of 2 Not To Scale
WARNING—FOLDING OR MUTILATING WILL LEAD TO REJECTION—PLAN MAY BE ROLLED
|
=|
“REFERENCE MARKS. oO;
STN. TO BEARING Dist BRAND we wo i
2.\or |14/°0¢10'| 10 Gone a
pot 7 .| 1 PI . 0-557 nt
at 8 .| o1P im vo Gone |
"I “a w . . « * |
2 7a.| * | 322°02'10 . é i
- i
i
=: TRAVERSES a Ted
LINE | BEARING. UST. . .
722 | 231°2550"| 75-754 wo
8+20 | 32190410" | 14:20 A
16-18 \159%14' |24-532 Sedu th Cone.
21-22 | $2%48'50"|20-038° Maieahg ‘Weil
22°23 | 5/48'40"|20°0 . fi
23-24 |50°28'40',|20:082
24-25 |50°0610" |20'157 3
25 = 26 |4/°57'20" \I3-085 ‘
a ‘6
~ .
Yoos, i
R Ve, -
+69, ea
itty, oes
ote 2 Seek oa
3 Mig,
4 A
& OP 0.04 SW DOISE, g
z OP (recent) O-OINE.O-O2NW.
w
2 J ¢
* 3
z= D
= 218) g 2
3 - 5
6 =
‘NoO Mks. 3
. 237°53'20" (6-8) =
a Coc Lartica Fence 2
- O31 ME. O-20SE. D
3 &
= mi
| :
al 8
. q e
8
‘i ; oon a
Serene fer PLAN OF LOTS.445
2 RANBIs' 4 5 of SECTION 17 z town___NQOSA__
cal ondRcomre : re Lots4e / parisH__WEYBA
SVS S728 4/51 Al/ot 4 Concelling Attots 4S 70k Section county__MARCH __
=| Vo/. 5544 fol. 156 Alloh 5 | gn PLAN N. 216-71 ven TY.
| PROCLAIMED ‘SUAVEYEDBY DM. Lov: MERIDIAN
- SURVEY AREA i 2. REGISTEREOPLAN 1 oh 2
J
RIGHT RESERVED; REGISTRAR OF TITLES, QUEENSLAND
artis lne seven a eta oe
Copyright protects the plan/s being ordered by you. Unauthorised reproduction or amendments are not permitted.
Page 5
CURRENT TITLE SEARCH
ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
Request No: 13709347
Search Date: 20/04/2012 12:32 Title Reference: 16353040
Date Created: 17/09/1982
Previous Title: 15798051
REGISTERED OWNER
Dealing No: 714295525 02/02/2012
JENNIFER LEANNE ALIZZI
ESTATE AND LAND
Estate in Fee Simple
LOT 4 REGISTERED PLAN 183112
County of MARCH Parish of WEYBA
Local Government: SUNSHINE COAST
EASEMENTS, ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by
Deed of Grant No. 15798051 (ALLOT 4 SEC 17)
ADMINISTRATIVE ADVICES -
NIL
UNREGISTERED DEALINGS -
NIL
CERTIFICATE OF TITLE ISSUED -
No
** End of Current Title Search **
COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [2012]
Requested By: SMIS .
Page 1/1
[OCR of page images]
CURRENT TITLE SEARCH
ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
Request No: 13709347
Search Date: 20/04/2012 12:32 Title Reference: 16353040
Date Created: 17/09/1982
Previous Title: 15798051
REGISTERED OWNER
Dealing No: 714295525 02/02/2012
JENNIFER LEANNE ALIZZI
ESTATE AND LAND
Estate in Fee Simple
LOT 4 REGISTERED PLAN 183112
County of MARCH Parish of WEYBA
Local Government: SUNSHINE COAST
EASEMENTS, ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by
Deed of Grant No. 15798051 (ALLOT 4 SEC 17)
ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL
CERTIFICATE OF TITLE ISSUED - No
** End of Current Title Search **
COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [2012]
Requested By: SMIS
Page 1/1
Page 6
~ ~. ; ~ ~~":1
~ .~ ~ ~
~
~,. ~. .~,! J4
,,":,’"
~?l
~~~~~~~kW~~~~~~~ ~~:r~
<...~
t?1
.;.-:~ F~:.:i . ;I;
BRIBIE PONTOONS,VASARD MARINE PTYLTD
I
ACN 082 111 046 ABN 35 797 508 843 Phone:07-3408382Z
169 Fir;[ A\’~nll~ Fax: 07 34084006
-
Bribie Island Email: \[email protected]
Qld 4507 PONTOON & WALKWAY DETAILS
Floatation unit to consist of solid block ofpoly styrene foam.
Fibre glass cladding to be single lay up of double bi-axle matting 900grams per sq meter.
40 mpa concrete 75 mm thick to deck of pontoon including galvanised steel reinforcing
with fibre mesh and silicon in mix design.
Pile sun-ound and mooring cleat fixing points cast into concrete deck.
All steel fittings 316 grade stainless steel.
Mooring cleats at two meter centers to face of pontoon.
Rubber gunnels to face ofpontoon and both ends.
Quality UV stabilised outdoor carpet in subdued color to walkway and pontoon.
2.5 mm aluminium sheeting to deck of walkway.
Light, water and power facility including 250mm sphere light, outdoor power outlet and
brass hose cock on 2.0m high aluminium post fixed on pontoon deck next to walkway.
Access will be required to property prior to pontoon installation to carry out necessary
concrete work associated with the installation.
[OCR of page images]
BRIBIE PONTOONS - VASARD MARINE Pty LTD
> 2 Phone: 07 - 34083822
169 First Avenue AGN 082 111.086 ABN 35 797 508 843 Fax: 07 - 34084006
Bribie Island Email: [email protected]
Qld 4507 PONTOON & WALKWAY DETAILS
Floatation unit to consist of solid block of poly styrene foam.
Fibre glass cladding to be single lay up of double bi-axle matting 900grams per sq meter.
40 mpa concrete 75 mm thick to deck of pontoon including galvanised steel reinforcing
with fibre mesh and silicon in mix design.
Pile surround and mooring cleat fixing points cast into concrete deck.
All steel fittings 316 grade stainless steel.
Mooring cleats at two meter centers to face of pontoon.
Rubber gunnels ts face of pontoon and both ends.
Quality UV stabilised outdoor carpet in subdued color to walkway and pontoon.
"2.5 mm aluminium sheeting to deck of walkway.
Light, water and power facility including 250mm sphere light, outdoor power outlet and
brass hose cock on 2.0m high aluminium post fixed on pontoon deck next to walkway.
Access will be required to property prior to pontoon installation to carry out necessary
concrete work associated with the installation.
Page 7
STRUCTURAL DESIGN CERTIFICATE for
PONTOONS/WALKWAYS
I, Ian Barnes ,being a Practising Structural engineer of Ian Barnes and Associates Pty Ltd ,hereby certify
that:
I. I am responsible for the design ofthe Building Work described as:
Marine Pontoons and Walkways,
as depicted on: Drawings Numbered A2-52425-01E, A2-52425-02D, by
Ian Barnes and Associates Pty Ltd & SP-404/1, NP-404/1.
and Specifications: Typical Canal Cross-Section Reference Job No 96272
Refer to Vasard Marine
to be erected by: Vasard Marine for: J. Alizzi
At Job Site: No. 10 Noosa Parade, Noosa Heads
2. TIle above mentioned Building Work has been designed in accordance with the principles of Structural Mechanics. If
constructed reasonably in a Tradesmanlike manner by experienced persons and in accordance with the documents
listed above, the work will be structurally adequate for the anticipated usage and will be capable of sustaining the most
adverse combinations ofloads to which it will be subjected in accordance with the relevant provisions of 1he Building
Code of Australia, 1he Building Act, Standard Building By-laws, and generally in accordance with 1he following
Australian Standards or References:
AS 1170.1,AS1170.2,AS 1664
Department of Environment and Heritage’s "Guidelines for the Construction of Works on
Tidal Land or Waters for Private Use".
The works comply with the relevant codes -
including the ERPA’s operational policy,
building and engineering standardsfor tidal works
3. In particular, the specific Design Criteria and assumptions used in 1he Design are as follows:
(i) Wind Design (AS 1170.2) Region B,Non-Cyclonic
Basic Wind Speed Vp= 49 mls; Vu= 60 mls; Design Height z =
3.0 m
Design Wind Speed: Vzp= 41 mls (33mls for Canal Areas)
(ii) Water Current: l.5m1s
(iii) Uniformly Distributed Floor Live Load (AS1170.1): 2.0 kPa / l.4 kN
0
(iv) Minimum Freeboard at Design Live Load = 75 mm,with maximum 15 rotation
(v) Durability: The structural concrete and steelwork are designed and or protected against the following
Environmental Conditions in accordance with the relevant Australian Standard Codes:
Exposure Classification B2
Name of Design Engineer: Ian Barnes Contact Phone No.: (07)5495 8444
Office Address: 16 Annie Street, P.O.Box 1378,CABOOLTURE,4510
Professional Qualifications: Bachelor of Engineering R.P.E.Q. Number: 3333
IANBARNES andASSOCIATES Ply Ltd
CONSULTING ENGINEERS
27th June, 2012
per I.D. Barnes
Engineer, BE,RPEQ 3333 Date:
[OCR of page images]
STRUCTURAL DESIGN CERTIFICATE for
PONTOONS / WALKWAYS
I, Ian Barnes , being a Practising Structural engineer of Ian Barnes and Associates Pty Ltd , hereby certify
that:
1, I am responsible for the design of the Building Work described as:
Marine Pontoons and Walkways,
as depicted on: Drawings Numbered A2-52425-01E, A2-52425-02D, by
Jan Barnes and Associates Pty Ltd & SP-404/1, NP-404/1.
and Specifications: Typical Canal Cross-Section Reference Job No 96272
Refer to Vasard Marine
to be erected by: Vasard Marine for: J. Alizzi
At Job Site: No. 10 Noosa Parade, Noosa Heads
2. The above mentioned Building Work has been designed in accordance with the principles of Structural Mechanics, If
constructed reasonably in a Tradesmanlike manner by experienced persons and in accordance with the documents
listed above, the work will be structurally adequate for the anticipated usage and will be capable of sustaining the most
adverse combinations of loads to which it will be subjected in accordance with the relevant provisions of the Building
Code of Australia, the Building Act, Standard Building By-laws, and generally in accordance with the following
Australian Standards or References:
AS 1170.1, AS1170.2, AS 1664
Department of Environment and Heritage's "Guidelines for the Construction of Works on
Tidal Land or Waters for Private Use".
The works comply with the relevant codes — including the ERPA’s operational policy,
building and engineering standards for tidal works
3. In particular, the specific Design Criteria and assumptions used in the Design are as follows:
@ Wind Design (AS 1170.2) Region B, Non-Cyclonic
Basic Wind Speed V,= 49 m/s; V,= 60 m/s; Design Height z= 3.0m
Design Wind Speed: V,,= 41 m/s (33 m/s for Canal Areas)
(ii) Water Current: 1.5m/s
(iii) Uniformly Distributed Floor Live Load (AS 1170.1): 2.0 kPa/1.4kN
(iv) Minimum Freeboard at Design Live Load = 75 mm, with maximum 15 ° rotation
(v) Durability: The structural concrete and steelwork are designed and or protected against the following
Environmental Conditions in accordance with the relevant Australian Standard Codes:
Exposure Classification B2
Name of Design Engineer: Ian Barnes Contact Phone No.: (07) 5495 8444
Office Address: 16 Annie Street , P.O. Box 1378 , CABOOLTURE, 4510
Professional Qualifications: Bachelor of Engineering RP.E.Q. Number: 3333
IAN BARNES and ASSOCIATES Pty Ltd
CONSULTING ENGINEERS
per LD. Barnes 27th June, 2012
Engineer, BE, RPEQ 3333 Date:
Page 8
b-O
~LengIh aooo / Mh Length 5000 14(X)() maxnun
’I
F41 gdv. mesh pix:ed with Mer
1000 Verticc1 struts at mox. 2000 as -coo
wire outside all Wr:J<way, Cd>Ie
CI1d Moorng Cleat.. Extra Anchor
~ P\ates ad other Plates cre to be
d os shown at mox. 400
200 . 100 x 3 PI with 2/M12 V prov
as with gdvcrisad tiewire.
C
.~ bolts at maxm..m ’600 Cr.I
~V .
~~
0V
~
"\.
~<< 150 x 40 x 3 PI at 400 crs 10
tie RHS 10 f1oa- 9cb. Plcte is
10 be welded 10 RHS with 5 IT’ITl
cfw each side.
cA1=S::11::Z=11=S::11::Z=11 cj
[Z~~:
W~w Anct>lrs OCT 2
o WAU<:NAY sa: ElEVATDl
~
~ OCTAL 1
1)0 x II Plct. (160 Ion]) /" 1000 J,(nmro Ood< Width
with li del Ide t1TCll.Ql V rrm Hwd t.l:rine P Y or 1200 t.laxiTun Deck Width
8 t.ETRE PCWOOl
Cd>Io Anchor 80 x 6 PI (120 )
~-’~V~~~~~
each stde (CAa.E TY ) 1.112 DyncbcIt to SI
S."
Max. Length 14000 / Mn L...-.gth 7000
j:
~~
200 x 100 x 3 PI with 2/1.112
bolts at mox \500 as
Focrn to be
out Lrder
~
j~
2/100 .C
Plct..
~
.(*
0:"
""
’"
I-----l
liO
50 x 50 x 2.0 RHS Cross
Beans at ma>c. 600 cr.
~~r:’i ~el~
130
2/100 .II P
,
OCTAL
~ FMD W~AY CCtN:CTDl TO POOTClCN OCTAL 1 .
~.... :I - W AY FIXED CCN.ECTDl
V rrm Hwd t.l:rne Ay ex
2 rrm AUnmm Sheeting
50 x 50 x 2 RHS Gross
Beans at rrox. as
F CCN.ECTDl TO SI-C IlA 79 PQt~1
SECTDl C -
C ~WALKWAY
150 x 40 x 3 PI spaced F41 g::tvcrised mesh centrcjy
oo.~~
60 x 6 PI (120 ) at 400 crs. to tie RHS pIoc:I!d n 75 rrm skb.
M12 Oyncbclt to Skt> to floor __ Plcte is to Corae1e to be t.(aopoz Mx
3 40 MPo at 28 days)
be welded to RHS with (Pc ~:::::~~ne~~
14 t.ETRE PCWOOl
\ 5 mn ctw each side.
(Pl..E No{) STRUT TY )
~oox ~)~ ~i:1iM12 ’r<V
150 x 40 x 3 PI at 400 crs to
tie RHS to f1oa- SIcb. PIote is
10 be welded to RHS with 5 rrm
c(w ea:h side.
2.
NOTE:
F+l g::tv. mesh placed with outer wre outside cj
Wd<way, Cd:>Ie CI1d MooriIXJ Cleats. Extra Anchor
Aat~ ald other PIotflS ere to be provided as
shown_ 01 rTlOX. 400 as, with gc1v<rised tiewre.
For PonlOOfl9 over ’() me:res n length. depth of
corcrete 1\ocr skb is to be inaeased to 100 rrm.
end "",nun fbot depth increased to 600 rrm.
bolls Ihroug, 80 x 50
RHS Perimeter Bean
PlAN VEW W"y
~J. Gussets (ex 100 x 1) Plot.)
" WIth - 9Jssets to Wd<woy
CCtN:CTDl TO POOTOON
Fit;,.~s Sheath
(BiolOa st-tilXJ),
rivetted to trane.,
with mn 20 rTYT’I
0’"’’’’’’ rxoxrd top
edges
Polystyrene 810dc Pontoon FboL
]
Pontocn Pool Depth
(Mh 540 rrm Mox.
700 rrrn). Depth rrat
ncr-eose to 100 nYT1
to suit heicj1t of the
moaed vessel.
BoT
701
:lOT
li do. shafl tlrCll.Ql
t:.
50 It 50 x 2.0 RHS Gros,
~~~ ):~~b=~ ~’ie.~~’! 4/M12 ole +/1.116 boIto with IonQ ruts :
Depth of Float is to suit Size of
PcntOOl\ a1d LOIXJ(h of WcI.<way.
80 do. RoIer (80 ) BeCJT15 at max. 600 as
detciled en Drawng No. 52425/11/01-01 DESIGN ASSUWnONS: -
-4!M12 to Cd>Ie Anchors (.>5 long)
t Moxnun Size of Vess.. BET,.... 1 aid IXTAL 2 -
WAU<YiAY RCUER CXJtN:CTD4
(t70CO SECTDl A A
~::’.::.~-(T
-
_
:: = ~\~f~~V~~ ;; ~SO ::: F WN:CTDl T9 61 ~IlA TO POOT()()oj
NOTES ON FffiEGlASS S1H -
~Length of Winci’ood L Vessel =. ,.j1;11.
...
...
(rot to. exceed Pontocn Length less 1 metre 1 :
POLYSTYREN’: a{)Q( 15 -0 BE STRUCTLRALLY
~~’:,’!:nf(of’=~V~~x~ c. N/.;I..
-
.
COATED WITH AN t.f’ERVD.JS LAYER CF BIAX1AL RHS Edge Bean
WI IWfNIS IUJd .LSl7m"1l PQ(1’tQl AI W AY OETJ.LS
GlASS S TH TO PROTECT IT FROM SALT WATER eq..ivaom weig,t of t5 kPo ("k9/sq:n) ) COO1.lItG DQIDS _,...._
N;RESS OR AnAO< FROM WJlt.E ORGANSMS. 2. Moxnun Oesigl Wond Speed = +1 m/s lNon-Cydonlc} ...........
2. T STRUCTUlAL 131AXL GLASS Sl-EATH SHALL BE
AN !’.ERT SLBSTJW::E N T MARN: ENVflCl!+T 3. ~c:r~i1den~t,,::~"’W,;,,;,;:{s ~ydoric) Foan 10 be scooped
80 x 3 PI 10 MooriIXj And-ors
120 x 120 x 3 PI to C_ Anchor.
llO x 3 PI to Wr:J.<way Mch,,...
’A...._,.
OIIIDCL1\I&aG
~EU--
,.
......
..~ PRa’OS I
.,_
POtITtQl AI WAAWAY
SII. ,...,,, ltI" SA PA~~
I’Kl SHALL BE NST N STRICT ACCOROAI’CE out o.nder roxng boob
4. Maxrn.m length of the vessel is based on Ql osSl.lTl
ror,... V -/f/ "SIf H~APS
.PW:~QI
WITH TI-i’: t.WU’ACTtREfi"S SPECFCATICNS. Moxi’nrn Avtrag. Heicj1t of 20 ,; of it. length.
SECTDl B -
B
Job No. 52425-95 Ilrwg No. A2-52A2.5-i)1 E
[OCR of page images]
E
k
Max. Width 4000 / Min. Width 3000
x 10 x 3 Pi with
bolts at maximum 1500 crs
BE
ke
3:0
Max. Width 4000 / Min. Width 3000
44 METRE PONTOON
( PLE AND STRUT TYPE )
TE :
Pontoons over 10 merres in length, depth of
slab is to be increased to
NOTES ON FIBREGLASS SHEATH
1 POLYSTYRENE BLOCK IS “O BE STRUCTURALLY
F41 gatv. mesh placed with ouler wire outside al
Walkway, Cable and Mooring Cleat:
Fates ond other Plates are to be provided as
shown at max. 400 crs, with gavonised tiewire
Ss.
Extra Anchor
PLAN VEW W.
bo
4000 maximum
Vertical Struts ot mox_2000 crs.
50 x 6 PI (200
SedeE te B05 BP
Ange Bracket
Gussets (ex 100 x 10 Plate)
with double gussets to Wakway
Y_CONNECTION TO PONTOON
DESIGN ASSUMPTIONS:
Maximum Size of Vessel
- Beam of
to exceed Pontoon L
t
Weight of Wi
FARE
/essel
Length of Winched Up Vessel = *
th less 1 metre
essed =
Max. Length of Moored Vessel
Moored Vé
COATED WITH AN MPERVIOUS LAYER OF (max. weight of vessel shal not exceed a
GLASS Seo or PROTECT IT a SALT et equi weight of 15 kPa (150 ofan )
INGRESS FROM MARNE ORGANS! 2 Maximum Design Wind Speed = 41 m/s (Non—Cycionic)
2 TH BIAXIAL GLASS SHEATH SHALL BE Design Wid Speed for Conds = 33 m/3 (Nen—Cyciortc)
AN INERT SUBSTANCE IN THE MARNE ENVRONVENT 3. Live Load on Pontoon and Wokway = 15 kPa
AND BE INSTALLED N STRICT ACCORDANCE. 4. Maximum length of the vessel is based on on assumed
WITH MANUFACTURER'S SPECFICATIONS. Maxirnum Average Height of 20 % of its length.
4/Mi2_& 4/Mi6 bolts with
- fo Cable Anchors
looove = ee earns
7 >
WA.
nuts :
a Pontoon, ond Length of Wakway.
WALKWAY SDE ELEVATION
Oo 80
70
50 x 50 x 20 RHS Cross T. Gusset, ex
Beams at max 600 crs 30 0x OP
16 dia. shaft the
bites for bach 2/00x DP
FOR CONNECTION TO SHORE -GR-TO-RONTOGN-
400 0 tie RHS ploced in 75 mm skb.
to floor siab. Plate is to Concrete to be Micré
be welded to RHS with. (Fc = 40 MPa at 2
5 mm cfw each side.
p-
80 x 50 x 3.0 RHS n
Fibregss Sheath __—
(Biaxid Sheeting),
Fivetted to frame,
with min. 20 men
overlap cround top
edges
Polystyrene Block’ Pontoon Float.
Depth of Float is to suit Size of
SECTONA-—A FOR
®B dio shaft thr
B0'da Roler (60 Lng)
BETAECtanPDETAL 2 — WALKWAY ROLLER CONNECTION
DETAL 1
1000 Minimum Deck Width
1200 Maxirnum Deck Width
75 x 60 x 25 RHS.
[seme]
50 x 6 Stiffener
|_—to eoch SHS Post~_|
300 x 52 x 25 RHS_
J \
17 mm Hwd Marine Ply or 50 x SO x 2 RHS Cross
2 mm Auminium Sheetir Beans at max 600 crs
SECTION ¢ — © THROUGH WALKWAY.
yb
00x DPI
50 x 50 x 20 RHS Cross
Beams at max. 600 crs
FOR CONNECTION 0-SHORE-OF- TO PONTOON
JAN BARNES and ASSOCIATES De
(CONSULTING ENGREERS a7 rao ant
‘alle 5 3 onde sh, Pane (7) bas nese
rs) Fux (7) Bae ous
SiaccLTine 40 Mebts bem) a7 SD
==
Pez Date: zaliiley
PONTOON AND WALKWAY DETALS
PROPOSED NEW PONTOON AND WALKWAY
Sie -/0 WOOSA PARADE
For = VASARD MARNE WWOOS# HEADS
Job No, 52425~95 | org He az-szazs-o1€_/
Page 9
NOTE:
N:JTES: FOR f’I...E TYPE F’O’ITOONS, 11-E
FCUOWNi w.xMM VESSEL
1 AI bolts 10 be Q-aje 316 Slciriess Sleel Pontoon
LfN;THS SHAll. N’I’LY :
2. Al.mnlm seclions to be Q-ode 6063-T5 os detaled
.3. AI w_ to be 5 rTYT1 dw UN.O. SheIt...od Noc (W33N)
4. Desi91 Live Lood 15 kPa (UDL)
6. 00 NOT SCALE OFF 1lRAwn;s
7. M::Jximrn T1t for worst Iood"l < 15
0
~~.t~~ ~~lres
2 x 400 cia. pies -
12 metres
a "’" Freobocrd 75 rrm ot Desi91 Load
9. [).xing ittng of the Pa1I00n, odecfJoIe 2. Typicd ea,a Neo (W~"’N) 0"’-
~~~p~~n,~6t~ ~
to be orly with cast-n fem.Jes
[f;TAl 3
QJide <rod
N:J1E:
Wckw~edis~~~
2 x 315 da pil’.
2 x ~cia pies
-
-
9 metres
II metres
IQ.I PLE TYPE
~OCN.!t W AY -
sa:: ElEVATDI
Ro.....
or<U1d Pie ~ck, filledor ~~~~~~.
to side of PontOa1
1600 x 500 x 750 de", Footng. overage heiglt of the vessel to
be eq.xl to 20 70 of its length.
[f;TAl 4 with 4/Mlj bats 10 Base Plot.
Q-0U1d Anchor, as (tor tixed W~way coorect.ion}
1600 x 500 x 750 deep
Footing. with M1i bolts
LAYOJT f’I..AN
!
delcilod below
6/Y20 bas a1 2’0 P.CO.
F’or a roler comection to the
W~oy, provide a flat ,...foc.
lo"’"l’l"rl the R_s.
PLE TYPE LAYM PlAN ~fi.tide
Water
---
~I
with W6 heix (120 pitch)
.
80xlO~x751<rq 2/75 x 75 x II
l.!J -
.
l’i do. shaft llYou;jl
Wx’O~
BO:U~~ i
315 do. tPYC Pipe or
tQQ di P _t Pit
far l’i da pin
"-~ t~ Meal Low Water
Spring Tide
G=els~~ t;;
au~50 ft1i
N:JTE: NOTE:
4 / Ml2 Belts, :-:_...J Cona-e:le is to be pklced in
9..dl 0 Il"ICJ""flef to erlSlre
6 x M16 bolts 01
cO"Y’l8Ction to Footing 315 da File 10 be
errbeL PLE TYPE PCM"OCN & W AY -
sa:: El.EVATDI
prrm~ fO that it cbes not mix with
sdt water. AI concrete is
10 be 32 t.f’a 01 28 days,
55
-it--
55
~.......
4500 mn inlo S<rod FCUldalion
(3750 rrm for 400 da. Pie)
l ii1
BasePbte
~ end shd be VDroled in place. 13W Nan
I-. 9-O<E W AY c:ctn:CTDI OCTAL
~a...EAT
~ +/M12 51 Stl llYeale<i ro trrou;jl
crqes <rod BO x RHS
~_~! 50~ !
~I
I I I
PLE [f;TAL
1200 "’"
so x II ~ for C<i>lo
.
Norr. 300 SO visible
~.- 6 ~ (M.S.) baled SOx60x6.( lOOxSOx6.0
"00 x 50 x 3.0 RHS Packer
at 9’"<U1d level
~U x 10 A wilh 2/M12 I.l1derSOx50x3.0RHS SECTDI C -
C Iwje !racket IvYje Brockel.
60 x 4.0 A. with 3/M12 SO x 6.0 A each side
i
1 bolts end 35 rrm bog ruts of housing far File Ralers
100 "00 x 50 x 6.0 NYje Brcx:ke~
J=~
"OOx50x3.0
RHS packer lSlder 50 x 60 x 6
MR~~~e~S6W~
315 da or 400 die.
Plle as specified
8Ox80x6.0
IvYje frcrnework
12 do. SSU pin llYou;jl 60
dia. x BO bog Poly Ralef"s
-
fixed with M12 bats 10 ski>
.......,....
’&"1111
"-SJ--
r.
~
Wi BAJUf/lS .ad A.S:5IX:UllIS lIr
CQ6U.TJ<<; .,JIII___
.......
~~AI W WAY DETALS
I’IIOI’OSED _ PONT~ AI W WAY
SO x 50 x 3.0 RHS NYje Etcx:kets
....u\I&aD ..... _..
sa. :-fON ,U1 flllt(1I0e
PLAN ~ For:- VI>S>>!O WNHN’ SA 1{~"i>S
[f;TAI. 4
SECTDI B- SECroN A - A
~Itol Job No. 52+25-95 Drwll No. A2-5242S-ll2 D
[OCR of page images]
NOTE:
"toon as detailed NOTES: FOR PLE Type ponToONS, THE
g 1 Al bolts to be Grode 316 Stainless Steel Pontoon ‘OLLOWING MAXMUM VESSEL
factor Chai 2. Auminium sections to be Grade 6063-TS as detaied EERSTE HALL ABEL:
Minimum Cable ‘os detoled 3. Al wekis to be 5 mm cfw 1 Sheltered Area (W33N)
Ange, not less — ‘4. Desicn Live Load 15 kPa (UDL.) r Maxirum Length of Vessel
less than 25 © CF @ men mistrond _|9. Madam Tit for worst eeu < 15 © ia e= bee
fom i a
LS tanless Stee! Coble Mo. Fredbeard 75 rn at Dean Load a = a aoe
with turnbuckles ing fting of Pontoon, te 2. Typicd Cond Area (W41N) _
RS appart mst be maintaned cross the | pea ay 5 Pp Ca tre Ces
€ ‘width of the Pontoon, and lifting is AL NOTE: 2 x 400 da pies — 0 metres
e to be only with cast-in ferrules Guide and Wales Ee ie NON PLE TYPE. O uan SSOE ELEVATION
p Roles on Rolers . NON PLE TYPE PONTOON & WALKWAY — Se BEVATEN
& around Pie on Deck, or fixed | | poe Bot eee
1600 750 deep Footi to side of Pontoon ‘average height o WALRWAY FOOTNGS & GROUND ANCHORS TO BE LOCATED CLEAR OF THE
Cm sn a ae be ee eee be equal to i RETANNG WALL TO ENSLRE THAT NO VERTICAL OR LATERAL LOADS ARE
DETAL 4 with 4/MB5 batts to Base Plate MPOSED ON THE W/ REQURED BEARNG CAPACITY = 100 kPa
Ground Anchor, as {for fied Wakeway connection a eee
"4800 x 500 x 750 deep dataied below Gone erento aiineine >]
Footing, with M'6 bolts to support the Rollers. 3
OUT PLA !
LAY. 6/Y20 bars on 20 PCD, PLE TYPE LAYOUT PLAN
with WB helx (120 pitch)
80 x 10 Pl x 75 long 2/75 x75 x0
da shoft the gees
315 da. uPVC Pipe or T'S do pa
Seton Bement
2 ws Pp no — [if Wokway is bolted to Pontoon,
Worercy to be supported on the Wakway is to be supported
Rolers on the Deck, or fixed on Rolers on a flat concrete
10x OA L}- | to side of Pontoon surfoce (or on a new Footing)
Re is to be ploced i j Br ins bots ot |
ele is to in x a PLE TYPE PONTOON & WALKWAY — SDE ELEVATION
an cmemer fo avars l! fe» + connection to Footing 335 da Pik to be embedded PLE TYPE PONTOON & WALKWAY — SDE ELEVATION _
that it does not mix with 4500 mm into Sond Foundation
sdt water. Al concrete is 55 55 (3750 mm for 400 da Pie)
to be 32 MPa at 28 days, a ae . a
ond shal be vibrated in place. 1540 Nom. U
f. K_| ec 7] >
Piles to 5 SHORE WALKWAY CONNECTION DETAL, n Z ., “ x 60 x 6.0 Chamel
CLEAT BE specification to withstand Se AE
SABER EAT — aeons fl ct ts | Sy
to 80 x 80 x 6 Ange vy ; BO x 80 x 6.0 Ange
< 4/Mi2 St Stl threaded rods through 7 ‘fis
dourble anges and 80 x 50_x 3.0 RHS aku
— — ,— fu s sist aoe Broce dong ead side
— bon 20.0 RE ‘ ‘
q + . a
1 “N
4 N 7 .
\
1200 Min. 4
v
100 x SO x 60
SECTONC-C Ange irothet Ange Brockels
BO x 6.0 Pl each side
i Roler Brockets welded
of housing for Pile Rolers ihe aes |
2
80 x 80 x 6.0 Ange
S77
60 x 40 x 40 Bo 80 sie
300, Sere Brocket anys Teoma JAN BARNES and ASSOCIATES Of | PONTOON AND WALKWAY DETALS
peas Ange Bracket 7 ; CONSULTING ENGREERS sa 7 ca at
eee oa Fa ao bs Pay Roles Lae ™ "GR be cite | PROPOSED NEW PONTOON AND WALKWAY
6 Pie as specified ia. x 80 long Poly
p enete cmcam wo Me bem 2) Hy -/(Q MOOS PARADE
— SECTN SECTION B - SECTION A — A 2 For s_VASARD MARNE A/BOSA HEADS
\ DETAL 4 ——— 2 Dotes 22 il0(] sob No 62425~-985 [Prva te. 42-52425-02 0 _/
Page 10
[nLet
238°0'"o"
LIME OF EIST.
Rack Bot DEG sea’
REVETINENT-
“o¢le
Geuae (07)
algo Mer
Ler §
4k BETWEEN EXIST.
STRUCTORES ESTHER
SIPE CF Lor he.
BRIBIE PONTOONS - VASARD MARINE Pry Lrp
eck Client : J Alizzi
aa Site address : 10 Noosa Parade, neato
Qid 4507 Noosa Heads. Ensails [email protected]
aes DETALS: new POuTOCN Drawing No :SP—404/1 Date 27/06/2012