                26 July 2012
                                                                                                        Department of
                                                                                                        Transport and Main Roads
                Vasard Marine
                 169 First Avenue
                Bribie Island Qld 4507




                Dear Sir



                Tidal Works       -

                                     Request for comments
                Pontoon     -
                              J Alizzi, 10 Noosa Parade,Noosa Heads (Lot4 RP183112)



                Thank you for your letter 27 June 2012 about your proposal to construct a pontoon at the location
                mentioned above.



                As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the

                following navigation and marine safety conditions are complied with.

                 1.   The contractor must build the pontoon according to Vasard Marine Pty Ltd, drawing SP-404/1,

                      attached to your letter dated 27 June 2012.



                2.    No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from

                      the side boundaries of the allocated water space as shown on the submitted water allocation plan.



                3.    In the absence of a designated quayline, the structure and any part thereof must not extend beyond

                      that ofneighbouring approved structures.


                4.    The applicant or his agent is responsible for the removal of any existing structure above or below
                      the waterline, and must contain and remove any debris. Any pile that needs to be removed must

                      be totally extracted.


                5.    The ship moored at this pontoon must follow the most direct course from this structure to open

                      waters and a similar direct course when returning to this pontoon.




             Department of Transport and Main Roads                  Our ref     215/01638 P14840-MOM P14872-MOM
             Maritime Safety Queensland                              Your ref
             Marine Operations (Brisbane)                           Enquiries Geoff Prendergast
             MacArthur Avenue East                                  Telephone +61 7 38603504
             Pinkenba Queensland 4008                                Facsimile   +61 738603571
                                                                     Website     www.msq.qld.gov.au
                                                                     Email       [email protected]


[OCR of page images]
Queensland
Government

26 July 2012
Department of

. Transport and Main Roads
Vasard Marine

169 First Avenue
Bribie Island Qid 4507

Dear Sir

Tidal Works — Request for comments
Pontoon — J Alizzi, 10 Noosa Parade, Noosa Heads (Lot 4 RP183112)

Thank you for your letter 27 June 2012 about your proposal to construct a pontoon at the location
mentioned above.

As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.

1. The contractor must build the pontoon according to Vasard Marine Pty Ltd, drawing SP-404/1,
attached to your letter dated 27 June 2012.

2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.

3. Inthe absence of a designated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures.

4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.

5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.

Department of Transport and Main Roads Our ref 215/01638 P14840-MOM P14872-MOM
Maritime Safety Queensland Your ref

Marine Operations (Brisbane) Enquiries Geoff Prendergast

MacArthur Avenue East Telephone +61 7 3860 3504

Pinkenba Queensland 4008 ‘ Facsimile +61 7 3860 3571

Website www.msgq.qid.gov.au
Email [email protected]

Log in to download the original (Development Application part 2 of 2.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.