   7.         The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel

              clearance at all stages oftide. The ship must comply with any local restrictions placed on channel

              depths and draft restrictions.

   8.         Any ships and equipment you or your agent use must comply with the Transport Operations
              (Marine Safety) Act 1994,the Transport Operations (Marine Safety) Regulation 2004 and the
              Transport Operations (MarinePollution)Act 1995.


   9.         Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
              1994 and the Transport Operations (MarineSafety) Regulation 2004.


   10. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict

              safe access to or from neighbouring structures.


   11.        Any ship, dry berth or device (including Air Lifting Pontoons)berthed, moored or attached to the
              pontoon must not exceed the following sizes:


                    Wet Berth                                                       Dry Berth
              Length Overall    -
                                    10    metres                                      N/A

              Beam-                 4.5   metres




   12. The contractor must construct the pontoon within two years from the date of approval. If

              construction is not completed, you will need additional or amended comments from the Regional

              Harbour Master.


  Maritime Safety Queensland does not need to be further consulted if all of the above conditions are

  met.



   The above conditions must be included in your application to the assessment manager.


   This agency will also forward a copy of this letter to the Assessment Manager.




   Yours sincerely




 .,.p""
        qJ~
          -




   Captain Richard C Johnson
   Regional Harbour Master (Brisbane)




                                                                                                          Page 2 of 2


[OCR of page images]
7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.

8. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.

9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.

10. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.

11. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
pontoon must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall- 10 metres N/A
Beam - 4.5 metres

12. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

‘bf?

pene,
Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Page 2 of 2

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 of 2.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.