Council archive · source document
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published] · 172007.344
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed fidal work rever to
Guide 24,
lf you answered "YES" to Q12, the application
triggers referral to the Port Authority.
‘The Port Authority is a concurrence agency if the
development is -
within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commerciat
shipping wharf, a mooring, anchorage or spoil
grounds;
+ @ within 1000m of a planned port facility identified
in a land use plan approved under the Transport
Infrastructure Act 1994.
tn ail other situation the Port Authority is an advice
agency.
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local goverment
is the assessment manager for all prescribed tidat
work,
you answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
13.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?
—X) NO
(0 YES - complete Pert M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina®° with more than 6
vessel berths?
JNO
(DYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidat works in strategic port land tidal
areas
For more information refer to Guide 18.
Unless you answered “NO to Q14, the relevant Port
Authority Is the assessment manager for the
application and the Envirc
Agency (EPA) and Queenstand Transport (an are
concurrence agencies for the application.
Heritage
For further information refer to Guide 19.
tf you answered “YES" to Q15, the application
triggers referral to the Queensland Heritage Council
concurrence agency for the application.
=
15.
4.
Does the application involve tidal works within a strategic port land tidal area2'?
INO
(71 YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
INO
(7 YES - complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Wafer Act 2000 and
For more information, including a list of the declares involves: (tick the applicable box/es)
catchment areas within Queenstand, refer to Guide ‘ . * . ee
B " san ixeensien x= (1 () _ reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Uress you answered “none of the above ta a6, C1 (ii) development assessable against the planning scheme involving the establishment or
beeen entof ee ES OY Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRMW is the assessment a
manager fo the application, NRMW is a W (iil) none of the above
concurrence agency for the apptication in relation to
this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use and/
of reconfiguring a lot may trigger this referral.
For more information refer to Guide 5.
Unless you answered ‘none of the above" to 17,
the application requires assessment by the =.
Environmental Protection Agency (EPA). if.an
agency other than EPA Is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.
(1 (i) reconfiguring a tot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
Di(ii) a material change of use —
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 7
& (iii) none of the above
19 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategie port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file