Council archive · source document
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published] · 172007.344
INTEGRATED PLANNING ACT 1997
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation.
Unies you answered “none of the above” to Q18,
the application triggers referral to the agency to
which the easement is granted in favour of as advice
agency.
(DAS Assessment Checklist, Version 18.0, 10 November 2006
18. The application involves: (tick the applicable box/es)
CJ (i) reconfiguring a tot where any part of the lot is -
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
© any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
BX (v)_ none of the above.
Oi)
D iii)
Ot)
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may trigger
this referral.
For more information refer to schedule 2 of the 1P
Reaulation
Ifyou answered "YES' to Q19, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.
If an agency other than the designator Is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -—
(a) for the designated purpose; or
{b) carried out by, or on behalf of, the designator.
&J No
(Yes
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.