Original source · versioned page text
Att 7 - Traffic Report
Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.
Parking and Access Report17734
11-19 Hilton Terrace, Tewantin
Tewantin Retail Pty Ltd
May 2017
5. ACCESS & SIGHT VISIBILITY
The location of the proposed access driveway on Earl Street has been reviewed in
accordance with the requirements for access location as specified in Figure 3.1 of
AS2890.1. The driveway is located 6m from the tangent point and therefore complies
with current requirements. The access from Earnest Street also provides suitable
separation from the intersection and adjacent driveways.
Figure 3.3 of AS2890.1 provides minimum sight lines for pedestrian safety at
driveway accesses. To provide safe passage to pedestrians and cyclists on the
pathway, sight lines must be maintained between the property boundary and the
driveway as shown in Figure 3 below.
Figure 2– Sight Visibility Requirements
For Pedestrians and Cyclists at Driveways
The proposal complies with the requirements and the sight triangles are clear of
permanent obstructions. It is recommended that any vegetation or landscaping
treatments located within the sight triangles remain below 1.0m in height so as
driver eye height is unobstructed.
Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.