Original source · versioned page text
2017-04-20 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 20 APRIL 2017
Health and Safety
The development must not, at any time during the life of the development, result
in human exposure to environmental electromagnetic emissions exceeding the
current regulations, standards and/or recommendations of the Australian
Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
infrastructure must provide, at any time upon request by Council, written
certification to demonstrate compliance with this condition. The written
certification must assume:
12.1. a maximum number of users over the lifetime of any pole or other
supporting structure
12.2. full power usage
12.3. a maximum down tilt of antennae
Warning information signs and security fencing must be provided on the site to
prevent unauthorised entry. Fencing must be camouflaged through the use of
colours, materials and screening vegetation to blend the fence into the visual
landscape.
Colours and Finishes
The monopole and associated panels must be finished in colours that blend in
visually into the landscape.
Cessation of Use
The telecommunications facility must be removed from the site upon cessation
of the use.
Landscaping Plan
Dense screening vegetation shall be established around the enclosure in
accordance with an Operational Works approval, Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan. Such
landscaping is to be completed prior to the commencement of the use and
maintained at all times thereafter. The Landscape Plan shall include at a
minimum:
16.1. The identification and retention of the existing trees within a 50m distance
around the fenced compound area of the tower.
16.2. Appropriately selected tree species and understorey plantings to achieve
dense visual screening of the tower and having regard to the soil
conditions. Trees included shall be able to achieve up to 20m in mature
height, though inclusion of fast growing species is also desirable to achieve
early visual screening.
16.3. The planting areas should maximise the screening opportunities
surrounding the tower and include appropriate planting for a distance up to
20m beyond the perimeter of the lease area, whilst maintaining access
and electricity supply.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The telecommunications facility will provide coverage for the NBN fixed wireless
network, allowing for the delivery of higher speed data to rural residential
households in the Cooran area; and
2. The proposal will not significantly impact on the visual or residential amenity of
the locality as appropriate separation distances are retained to existing nearby
residents and the tower will be partly screened by existing vegetation.
Page 7 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.