Skip to the record
Beware of cheap imitations.

Council archive · source document

Planning Report 3032a · REC13/0095

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                12



                 Specific Outcomes                                     Solutions
or other noise sensitive uses.
O11 For lots in the Rural Settlement Zone—a          Not applicable.
sealed access to the nearest urban settlement is
available.
Water supply for fire fighting
O12 An adequate and accessible water supply          All lots will be connected to a reticulated
is provided for fire fighting purposes.              water supply that is reliable and conforms
                                                     to Council’s Standards.

Energy efficiency
O13 The street and lot orientation facilitates the   All lots contain sufficient area to allow
construction of energy efficient buildings that      orientation of dwellings to maximise solar
respond to the local climate conditions.             access.

AND

O14 For residential development, the subdivision
design provides for the maximum practicable
number of lots with house site areas that—
a)   maximise solar access to the north in
     winter;
b)   minimise solar access to the east and west
     in the summer;
c)   maximise access to any prevailing summer
     breezes; and
d)   minimise exposure to prevailing winter
     winds.
Infrastructure
O15 Each lot is capable of being serviced by         All lots will be connected to power supply,
appropriate levels of—                               telecommunications services, water
a)    water supply;                                  supply and sewerage reticulation. The
b)    reticulated sewerage;                          proposed location of the Lots with
c)    stormwater drainage;                           extensive road frontage allows for them to
d)    power supply; and                              be connected to services from the road
e)    telecommunications;                            with minimal impact on the environment.
AND
O16 The design and provision of public services
and utilities, including sewerage, water,
electricity, street lighting and telecommunication
services—
a)    meets the needs of users;
b)    ensures health, safety and convenience of
      the community;
c)    protects the natural environmental values
      of the site and surrounds, including visual
      amenity and native vegetation;
d)    are cost effective over their life cycle;
e)    minimises adverse impacts to the
      environment (including the amenity of the
      local area) in the short and long term; and
f)    ensures that the existing systems are
      upgraded or relocated to be capable of
      supporting the proposed development;
AND
O17 Essential public utilities are available and
maintain their function during flood events up to



                                                12

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report 3032a.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.