a 1% AEP (1:100 year ARI) flood event.
Electricity supply infrastructure All newly subdivided lots are located
O18 Uses and works maintain a safe distance away from the easement and in excess of
from electrical infrastructure including 50m from any substations.
substations, overhead power lines, power poles
and transformers.
Earthworks and stormwater management
O19 Stormwater run-off is managed so as not to Each lot has appropriate means of
cause any adverse impacts on the built or disposing stormwater with the topography
natural environment including changes in quality, allowing for all stormwater from the
quantity or location of stormwater discharges. proposed Lots to flow into the drainage
lines and watercourse. Following the
development of the site the stormwater
will continue to drain to the watercourse;
however the development permits the
integration of on-site practices that will
control the run-off from the site.
O20 Filling or excavation only occurs where it The existing major drainage line that
does not adversely impact on— traverses the site will be retained.
a) watercourses, drainage lines and
wetlands; or There will no impact on Biodiversity
b) vegetation on land identified on values of the site.
Biodiversity Overlay Maps OM1.1-OM9.1;
or
c) water levels on properties elsewhere.
Landscaping and visual amenity
O21 Land development responds to the The natural landform and landscape are
distinctive landscape character of the site by not modified to accommodate the
utilising the natural features of the site, which development.
include—
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views.
O22 Native vegetation, including individual All native vegetation located in
mature trees are retained, protected, maintained environmentally sensitive areas site will
and supplemented, with particular consideration be retained and enhanced by the
given to— development.
a) roadsides;
b) the amenity of adjoining land uses; and
c) the protection of environmentally sensitive
areas.
O23 Buildings and other structures do not have All lots include a building area that will not
a significant adverse impact upon the visual protrude above ridges and can conform to
amenity of surrounding areas. the character of the area.
Open space and environmental protection
O24 Public open space provides for a diverse This proposal does not include the creation
range of passive and active quality recreational of new public open space however it
opportunities including sport to meet the outdoor retains existing open space that can be
recreational needs of the community. used for this purpose if needed.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report 3032aRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.