Council archive · source document
Information Response to DNRM MCU12/0208
Results of preliminary assessment
MCU applications that involve particular development on SCL are assessed based on the extent/location of the
development footprint in relation to the SCL on the subject lot under the relevant section of SPP 1/12. For SCL
assessment purposes, footprint has the same meaning as Schedule 26 of the Sustainable Planning Regulation
2009. For preliminary approvals unless demonstrated otherwise, the development extent as per the plan of
development is taken to be the footprint of the development.
2
The proposed development has a footprint greater than 3000 m and is located within the strategic cropping land
management area. Section 4.5 of SPP 1/12 states that development that is for a MCU in the management area,
only complies with the requirements of SPP 1/12 if it satisfies the requirements in section 4.2.2 of the SPP.
Additional information required to assess the application
Further information is required to demonstrate how the proposed development will satisfy SPP 1/12—
specifically how the proposal meets s4.2.2 (d) of SPP 1/12 and should include but is not limited to a report
that demonstrates:
That the development provides a public benefit and no other site is suitable for the particular purpose
(overriding need).
How permanent impacts on SCL have been avoided to the greatest extent possible.
How permanent impacts on SCL have been minimised where impacts could not be avoided.
The location and area of permanently impacted land and the mitigation value (s139 Strategic Cropping Land
Act 2011) including:
[1]
Map/s or plan/s (at an appropriate scale) showing all areas of SCL and the location/extent of all footprint
components.
Calculate of the area of the footprint and the mitigation value.
How the applicant proposes to mitigate the impacts on SCL or potential SCL where they cannot be avoided.
Mitigation has the meaning defined in s138 of the Strategic Cropping Land Act 2011 and for permanently
impacted land, means that either of the following, or a combination of the following has taken place for the
2
land’s mitigation value
A payment to the mitigation fund.
The entering into of a mitigation deed.
Response:
Further to the Information Request issued by the Department of Natural Resources and Mines DNRM, a Strategic
Cropping Land (SCL) validation application has been undertaken over the proposed Noosa on Weyba site area in
accordance with chapter 2, part 2 of the Strategic Cropping Land Act 2011 (SCL Act). The validation application was
submitted, has undergone public notice and was subsequently approved by DNRM. The approval confirmed that
Lot 7 RP46782, Lot 52 SP163571, Lot 2 RP160983, Lot 11 SP250714, Lot 1667 M37772 and Lot 12 RP893393 fail to
meet the requirements necessary to satisfy the SCL Cropping History Test and therefore are not considered SCL.
Notwithstanding this the SCL Validation Decision stipulates that Lot 2 on SP179590 does meet the required
cropping history necessary to satisfy the requirement of s49 of the SCL Act and therefore this site is still mapped as
potential SCL.
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response to DNRM MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.