2018-07-06 SM - Attachment 1 to Item 1 - Operational Plan 2018-19
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn THEME 2: THE NOOSA COMMUNITY
“Our community is connected, safe and happy and
able to meet their potential”
No. Project Responsibility
1 Adoption of Cultural Plan and development of a 2019 Action Director Community
Plan Services
2 Adoption of Community Health and Wellbeing Plan and Director Community
development of a 2019/20 Action Plan Services
3 Begin construction of an iconic playground at Cooroy following Infrastructure Planning,
community consultation Design and Delivery
Manager
4 Complete Noosaville Library refurbishment Libraries & Galleries
Manager
5 Implementation of Sport and Active Recreation 2018/19 Action Director Community
Plan Services
6 Complete construction of Park Road Boardwalk Project Infrastructure Planning,
Design and Delivery
Manager
Noosa Council | Operational Plan | Page 8