Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-07-06 SM - Attachment 1 to Item 1 - Operational Plan 2018-19

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                     THEME 2: THE NOOSA COMMUNITY

              “Our community is connected, safe and happy and
                       able to meet their potential”


No.   Project                                                          Responsibility

1     Adoption of Cultural Plan and development of a 2019 Action       Director          Community
      Plan                                                             Services

2     Adoption of Community Health and Wellbeing Plan and              Director          Community
      development of a 2019/20 Action Plan                             Services

3     Begin construction of an iconic playground at Cooroy following   Infrastructure       Planning,
      community consultation                                           Design      and       Delivery
                                                                       Manager

4     Complete Noosaville Library refurbishment                        Libraries     &      Galleries
                                                                       Manager

5     Implementation of Sport and Active Recreation 2018/19 Action     Director          Community
      Plan                                                             Services

6     Complete construction of Park Road Boardwalk Project             Infrastructure Planning,
                                                                       Design and Delivery
                                                                       Manager




                                                                        Noosa Council | Operational Plan | Page 8
Log in to download the original file

2018-07-06 SM - Attachment 1 to Item 1 - Operational Plan 2018-19(PDF, 514KB).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.