Original source · versioned page text
2018-07-06 SM - Attachment 1 to Item 1 - Operational Plan 2018-19
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn THEME 3: THE NOOSA ECONOMY
“Our economy is diverse and resilient”
No. Project Responsibility
1 Finalise tenure and operating arrangements for the Peregian Digital Hub Director
Digital Hub
2 Continue implementation of Local Economic Plan with a focus Economic Development
on the priority sectors of rural enterprise, digital and sustainable Manager
tourism
3 Continue collaboration with Tourism Noosa on Sustainable Chief Executive Officer
Tourism Stakeholder Reference Group
Noosa Council | Operational Plan | Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.