TPC1845 approval and conditions

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

Letter to SIEMON & BRINKLEY 20/11/86. TPC 1845 TALABAR P/L Page 2.

10.

V1.

12.

13.

14.

15.

Contributions shall be paid in accordance with Council's Policy on
Water Supply and Sewerage Headworks. Such contributions shall be paid
within fourteen (14) days of building approval. Contributions shall be
payable at the rate current at the date of payment.

Current figure is estimated at:-

Water Supply - $10940
Sewerage ~ $4458

(Plus P.1I. index rises from September, 1986).
Payment of any outstanding rates owing on the property.

This consent approval does not imply Building Approval. Working
drawings shall be submitted in compliance with the Building Act 1975 as
amended and shall be substantially in accorance with the plans the
subject of this consent. (Substantial variations will require separate
Council approval).

The approval herein is for ‘Town Planning Consent only and does not
imply that Council approval will be granted to an application under the
Building Units and Group Titles Act.

Permanent covered car parking is to be provided on site for 16 vehicles

All internal roadworks (including parking areas) and access from the
existing frontage road to connect to the internal roadworks shall be
provided with a sealed pavement, which shall be designed, drained,
constructed and maintained in accordance with the standard and
requirements of the Shire Engineer.

Plans and specifications for the above works shall be submitted to the
Shire Engineer for approval prior to the issue of a Building Permit.

The Developer shall bear the cost of alteration of any public utility

or facilities necessitated by the development of the land or associated
development external to the site.

Connection to Council's existing water supply reticulation at the
Developer's expense to the standards and requirements of Council's
Building Surveyor.

Connection to Council's existing sewerage reticulation system at the
Developer's expense to the standards and requirements of Council's
Building Surveyor.

Filling levels and floor levels of all buildings, other structures and

car park area levels shall be established to the requirements of the
Shire Engineer. Such levels shall be provided upon application to the
Engineering Department.

1.0/3
Log in to download the original file

TPC1845 approval and conditions.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.