Original source · versioned page text
TPC1845 approval and conditions
Letter to SIEMON & BRINKLEY 20/11/86. TPC 1845 TALABAR P/L Page 2. 10. V1. 12. 13. 14. 15. Contributions shall be paid in accordance with Council's Policy on Water Supply and Sewerage Headworks. Such contributions shall be paid within fourteen (14) days of building approval. Contributions shall be payable at the rate current at the date of payment. Current figure is estimated at:- Water Supply - $10940 Sewerage ~ $4458 (Plus P.1I. index rises from September, 1986). Payment of any outstanding rates owing on the property. This consent approval does not imply Building Approval. Working drawings shall be submitted in compliance with the Building Act 1975 as amended and shall be substantially in accorance with the plans the subject of this consent. (Substantial variations will require separate Council approval). The approval herein is for ‘Town Planning Consent only and does not imply that Council approval will be granted to an application under the Building Units and Group Titles Act. Permanent covered car parking is to be provided on site for 16 vehicles All internal roadworks (including parking areas) and access from the existing frontage road to connect to the internal roadworks shall be provided with a sealed pavement, which shall be designed, drained, constructed and maintained in accordance with the standard and requirements of the Shire Engineer. Plans and specifications for the above works shall be submitted to the Shire Engineer for approval prior to the issue of a Building Permit. The Developer shall bear the cost of alteration of any public utility or facilities necessitated by the development of the land or associated development external to the site. Connection to Council's existing water supply reticulation at the Developer's expense to the standards and requirements of Council's Building Surveyor. Connection to Council's existing sewerage reticulation system at the Developer's expense to the standards and requirements of Council's Building Surveyor. Filling levels and floor levels of all buildings, other structures and car park area levels shall be established to the requirements of the Shire Engineer. Such levels shall be provided upon application to the Engineering Department. 1.0/3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.