Council archive · source document
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published] · 132007.2398
=—~ RSL Care Proposed RSL Retirement Village, Cooroy - Road and Rail Noise Assessment (Revised) 1.3. TASKS UNDERTAKEN The tasks undertaken for the project are as follows: a existing noise monitoring; ® prediction of future traffic noise levels using the Calculation of Road Traffic Noise (CoRTN) Methodology; a prediction of potential rail noise impacts; = identification of any acoustic attenuation measures necessary to reduce road traffic and rail noise; and a assessment of potential impacts of site traffic, services and fixed plant at the retirement village. 1.4 THIS REPORT This report summarises the methodology, results and conclusions of the assessment. All figures referenced in this report are presented in Appendix A and an acoustic glossary is presented in Appendix B to assist the reader. AIR NOISE ENVIRONMENT PTY LTD INETWORK/PROJECTS/1750/REPORTING/2008 REVISION/1750REPORTO4.ODT Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.