Council archive · source document
07/0339 - MCU - Detached House [As Published] · 132007.339
INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
Wf you answered “YES" to Q6, the application
requires assessment by the Department of
Emergency Services (DES).
It an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for he application in retation to this matter,
Water related development under the
Water Act 2000
For more information about items (a) - (d), refer to
Guide 15, For more information about item (e),
afer to Guide 14 Does my application Involve
nt of a referable ?
Unless you answered “none of the above” to Q7, the
application requires assessment by the Department
of Natural Resources and Mins (NR&M).
{f an agency other than NR&M Is the assessment
manager for the application, NR&M is a concurrence
agency for the application in retation to this matter.
6.
7.
IDAS Assessment Checklist, Version 15.0, 18 November 2005
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
ee
YES - complete Part L of Form 1
The application involves:
(Ci) operational work, for taking or interfering with water under the Wafer Act 2000, that is:
(tick applicable box/es)
Oe
Oo)
Ow
Ci)
Oe)
oO
in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ke, Ks, Ks, Ks, or Ko of
Form 1 whichever is applicable,
for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1;
for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part Kt of Form 1;
for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
for constructing a referable dam? or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; OF
for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
[M(ii) none of the above.
Removal of quarry material from a
watercourse
For more Information refer to Guide 16,
If you answered *YES" to Q8, the application
requires assessment by the Department of Natural
Resources and Mines (NR&M),
It an agency other than NR&M Is the assessment
manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.
Note: Part G of Farm 1 Is required to be completed
as the activity of removing quarry material from a
watercourse /s also an Environmentally Relevant
Activity (ERA).
Operational works in a tidal area or
coastal management district
For more information refer to Guide 18. For more
informatlon about prescribed tidal work in local
government tidal areas refer to Guide 24.
Unless you answered "none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).
Wan agency other than EPA is the assessment
manager for the application, EPAis a concurrence:
agency for the application In refation to this matter.
Local government is the assessment manager for all
prescribed tidal work.
Does the application involve development for the removal of quarry material from a watercourse®
requiring an allocation notice under the Water Act 2000?
Es NO
YES - complete Parts Kr and G of Form 1
The application involves operational work that is: ( tick the applicable boxes)
C1 (i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
tidal work that is prescribed tidal work"! other than in a canal’? -complete Part P of Form 1; OF
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked,
Dit)
DO iii
Oe)
Ob)
Oe)
Cd)
Oe)
Ow
O@)
Om)
Ow
constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal'2 intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tida! water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
ww (iv) none of the above.
7 The dectared ground water areas ara listed in Guide 13 Development in a declared catchment area.
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the PA,
10 Tidal work is defined in sch 10 of the IPA.
11 Preseribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment dal area.
12. Canal means canal as defined undar the Coastal Protection and Management Act 1995
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0339 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.