Council archive · source document
07/0339 - MCU - Detached House [As Published] · 132007.339
INTEGRATED PLANNING ACT 1997 Heritage For further information refer to Guide 19. tf you answered “YES" to Q15, the application triggers referral to the Queenstand Heritage Council as concurrence agency for the application. Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, refer to Guide 43. Unless you answered “none of the above” to Q16, the application requires assessment by the Department of Natural Resources and Mines (NR&M). If an agency other than NR&M Is the assessment manager for the application, NR&M is a concurrence agency for the application in relation to this matter. 15. 16. IDAS Assessment Checklist, Version 15.0, 18 November 2005 Does the application involve development in a heritage registered place as defined under the Queensland Heritage Act 1992? No LD YES - complete Part C of Form 1 The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es} (1 (i) | reconfiguring a fot, if any lot resulting from the reconfiguration is less than 16 hectares, CD (i) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994; iw (iil) none of the above Contaminated land 17. The application involves: (tick the applicable box/es) Ao renal and! oO reconfiguring a lot for which all of part of the premises are — For more information refer to Guide 5, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - Unless you answered *none of the above" to Q17, « item 5, including the exemption otherwise provided for by paragraph (d); the application ca Recnoe EPA) an « item 6, including the exemption otherwise provided for by paragraph (e); or Envirgame Agency (EPA). , rn : . . - agency other than EPA is the assessment manager « item 7, including the exemption otherwise provided for a mining activity or petroleum for the application, EPA will be a concurrence activity; or agency forthe apptcatio in tation to tis matter (b) inan area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 1 C1 (ii) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises Is in an area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 1 . Q (iii) none of the above Electricity infrastructure 18. The application involves: (tick the applicable box/es) For more information refer to schedule 2of the IP Regulation. Unless you answered “none of the above” to Q18, the application triggers referral to the agency to which the easement is aranted in favour of as advice agency. C1) reconfiguring a lot where any part of the lot is ~ * subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; or « situated within 100m of a substation site; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if - * any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and « any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement, a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation site; Di (iv) operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if — * any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; « the work is located wholly or partly within 10m of a substation site; DAW) none of the above. Oi) Diiiy 21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0339 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.