RSA Minney
C/- The Jetty Specialist
18 Ron Parkinson Cres
CORBOULD PARK QLD 4551
[email protected]
Dear Sir
Information Request
Planning Act 2016
I refer to your application and advise that Council requires further information to satisfactorily
assess the proposal.
1. APPLICATION DETAILS
Application No. MCU22/0029 & OPW22/0059
Street Address: Lynbrydon 2 2/1 Sunseeker Cl Noosaville Qld 4566
Real Property Description: GTP 102778, Lot 2 GTP 102778
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. INFORMATION REQUIRED
The information requested is set out below:
Issue
The subject site is part of a Group Title Plan and as such has a small frontage to the canal
(7.923m). The Waterways Works Code of The Noosa Plan 2020 includes specific acceptable
outcomes (AO16.2) regarding lots with narrow frontages. For lots with a narrow frontage it is
Council’s preference that a joint application with the adjoining property is submitted. The
submitted material includes the statement “This has been done as our client’s neighbour was
unwilling to contribute to the cost of the jetty and therefore our client wanted the jetty to remain
wholly in his waterspace” but does not include written advice from the adjoining owner.
Information Required
1. Provide written advice from the adjoining owner clarifying their position in regard to being
part of a shared jetty arrangement.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 30 June 2022. Email your response to
[email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Mark Lewis
Coordinator - Engineering