Skip to the record
Search everything, all in one place.

Original source · versioned page text

Year in Review 2022_23

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

GENERAL COMMITTEE MEETING                                                   18 SEPTEMBER 2023




Sunshine Beach Metal Half Pipe
The $350K project saw the replacement of the existing metal skate ramp at Sunshine Beach Skate
Park with a new bigger ramp, which features a modern surface consistent with those used in
competition. The new ramp is also more resilient in Queensland’s climate with the ramp surface
more user friendly when wet or hot.




Shire Bus Stop Disabled Compliant Program

As part of the nineth year of Council’s annual Bus Stop Program, five bus stops around the shire
were upgraded to be disability discrimination act (DDA) compliant. The upgraded stops in Noosaville,
Peregian Beach, Pinbarren and Tewantin were also fitted with new ‘Noosa Style’ shelter.
This year’s program totalled $287K with Translink funding 50% of civil upgrades and $19K per
shelter.
Log in to download the original file

Year in Review 2022_23(PDF, 8MB).pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.