Year in Review 2022_23
GENERAL COMMITTEE MEETING 18 SEPTEMBER 2023 Federal Middle Creek Road Reconstruction A 2km section of Middle Creed Road received a much-needed upgrade, which was fast tracked in response to the Black Mountain landslide. The section of road now has a stronger base and better flowing table drains, providing a safer environment for road users. The project, with a total cost of $1.55M, was funded through the Federal Government’s Local Roads and Community Infrastructure (LRCI) Phase 3 grant ($1.29M) and road betterment funding ($260k) through the Queensland Reconstructive Authority (QRA). Noosaville Landfill, Cell Expansion and Cell 1.1 Capping Project (Multiyear Project) The $8.4M project included the construction/expansion of a new waste Cell 1.1, Final Capping of the western batter of Cell 1.1 (where waste operations have finished), and the construction of a new high efficiency sediment (HES) basin on the south of the site to treat rainfall runoff and make sure only clean water is leaving the site. These works were critical to expand the landfills life expectancy & waste operations, as well as part of Councils levitative requirements for remediation and environmental protection requirements for operating the landfill.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.