Approved Plans OPW18/0118

of 7

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                GENERAL NOTES                                                                                                                  SUBSOILS:                                                                                                                                     EXISTING PAVEMENT:
                                                                                1.    DO NOT SCALE DRAWINGS.                                                                                                   9.   ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE THE RISK                              6.   WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS PER
                                                                                2.    ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.                                OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                                                      STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF THIS
                                                                                                                                                                                                               SUBGRADES:                                                                                                                                         PROCEDURE.
                                                                                3.    THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE CLARIFICATION
                                                                                      OF THE DISCREPANCY.                                                                                                      10. SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM 10T FLAT DRUM ROLLER AND ANY SOFT SPOTS                                 7.   ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO
                                                                                                                                                                                                                   OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                                                                      APPLICATION OF SEAL.
                                                                                4.    THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE SUPERINTENDENT
                                                                                      FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.                                                                          11. SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE ADEQUACY OF THE                                 8.   AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT WITH A
                                                                                                                                                                                                                   PAVEMENT DEPTH DETAILED ON THE DRAWINGS.                                                                                                       MINIMUM THICKNESS OF 100MM.
                                                                                5.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT
                                                                                      AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                12. THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A 10,000L FULLY LOADED                                 9.   IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE AFFECTED
                                                                                      SUPERINTENDENT.                                                                                                              WATER CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF                                          AREA.

                                                                                6.    NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL                DEFORMATION UNDER PROOF-ROLLING.
                                                                                      PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO                 13. THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING THIS                                         SIGNS AND LINEMARKING
                                                                                      OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE REQUIREMENTS THEREOF.                        INSPECTION.                                                                                                                               1.   ALL ROAD SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
                                                                                7.    ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                                                                                                                                                                   (MUTCD), PUBLISHED BY THE DEPARTMENT OF MAIN ROADS.
                                                                                8.    A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS, WHERE POSSIBLE.                                STOCKPILE MANAGEMENT:                                                                                                                         2.   ALL SIGNS SHALL BE SIZE 'A' UNLESS NOTED OTHERWISE.
                                                                                9.    THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF THE                   14. CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A GUTTER,                                   3.   SIGNS LOCATED WITHIN MEDIANS OR TRAFFIC ISLANDS TO BE INSTALLED USING LOC SOCKET.
                                                                                      NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                  DRAIN OR WATER BODY, SUCH AS:                                                                                                             4.   ALL SIGN FOOTINGS TO BE CONCRETE IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-130 AND RS-131
                                                                                10. WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND SITE                          ●    ON A ROAD PAVEMENT;
                                                                                                                                                                                                                                                                                                                                                             5.   ALL ROAD SIGNS TO BE OFFSET A MINIMUM OF 600MM FROM FACE OF KERB.
                                                                                    SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                                                                    ●    WITHIN AN OVERLAND FLOW PATH;
                                                                                                                                                                                                                    ●    ADJACENT TO STREAM BANKS.                                                                                                           6.   THE FINAL SIGN LOCATION IS TO BE AGREED ON SITE, TO ENSURE IT IS VISIBLE AND NOT OBSTRUCTED BY EXISTING
                                                                                11. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;                                                                                                                                                                                                                        INFRASTRUCTURE OR VEGETATION ETC.
                                                                                       ● CONSTRUCTION PRE-START MEETING                                                                                        15. CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM STOCKPILES
                                                                                                                                                                                                                   CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                                                7.   ALL SIGNS SHALL BE MANUFACTURED, AND INSTALLED IN ACCORDANCE WITH MRTS14.
                                                                                       ● SET OUT
                                                                                       ● DEMOLITION                                                                                                            16. ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT
                                                                                       ● SUBGRADE PROOF-ROLLS                                                                                                      CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.                                                                                   TRAFFIC MANAGEMENT
                                                                                       ● PRE-SEAL PROOF-ROLLS
                                                                                                                                                                                                                                                                                                                                                             1.   NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED APPROPRIATELY
                                                                                       ● CONCRETE PRE-POURS
                                                                                                                                                                                                               SITE REHABILITATION:                                                                                                                               CERTIFIED TRAFFIC CONTROL PLAN.
                                                                                       ● FINAL INSPECTION
                                                                                                                                                                                                               17. ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE COMPACTION,                              2.   THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE WITHIN
                                                                                12. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, ENVIRONMENTAL
                                                                                                                                                                                                                   AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                                                          THE APPROVED HOURS STIPULATED.
                                                                                    MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF PRINCIPAL AND
                                                                                    SUPERINTENDENT, PRIOR TO CONSTRUCTION.                                                                                     18. SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100MM AND HEAVILY COMPACTED SUBSOILS TO A MINIMUM                                   3.   THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED TRAFFIC
                                                                                                                                                                                                                   DEPTH OF 300MM.                                                                                                                                CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
                                                                                13. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE
                                                                                    SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                                          19. TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                                   4.   THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC MANAGEMENT
                                                                                                                                                                                                                                                                                                                                                                  ISSUES.
                                                                                                                                                                                                               20. ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.
                                                                                                                                                                                                                                                                                                                                                             5.   ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS, INCLUDING
                                                                                SURVEY
                                                                                                                                                                                                                                                                                                                                                                  MOTORISTS AND PEDESTRIANS.
                                                                                1.    THIS DESIGN IS BASED ON SURVEY PROVIDED BY JONES FLINT AND PIKE.                                                         EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                             6.   ALL PAVEMENT MARKINGS INCLUDING COLOUR, MATERIAL, APPLICATION SHALL BE IN ACCORDANCE WITH THE 'GUIDE TO
                                                                                2.    ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                         OBJECTIVES:                                                                                                                                        PAVEMENT MARKINGS' PUBLISHED BY THE DEPARTMENT OF MAIN ROADS.
                                                                                3.    THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.                              1.   THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE REQUIRED
                                                                                4.    ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND ANY                          TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
                                                                                                                                                                                                                                                                                                                                                             STORMWATER DRAINAGE
                                                                                      DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.                                                                  2.   THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND
                                                                                                                                                                                                                                                                                                                                                             GENERAL
                                                                                                                                                                                                                    MAINTENANCE PERIOD.
                                                                                                                                                                                                                                                                                                                                                             1.   EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH TMR STANDARD
                                                                                EXISTING SERVICES                                                                                                              3.   EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.
                                                                                                                                                                                                                                                                                                                                                                  DRAWING 1359
                                                                                1.    THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL BEFORE YOU               4.   THE CONTRACTOR SHALL PREPARE A CPESC CERTIFIED EROSION AND SEDIMENT CONTROL PLAN AND UPDATE IT
                                                                                                                                                                                                                                                                                                                                                             2.   ALL MANHOLES TO BE 1050MM DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.
                                                                                      DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                                                ACCORDINGLY DURING THE WORKS. THE EROSION AND SEDIMENT CONTROL PLAN PROVIDED AS PART OF THESE DRAWINGS IS
                                                                                                                                                                                                                    FOR USE AS A GUIDE ONLY.                                                                                                                 3.   ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                2.    THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE                                                                                                                                                                        STANDARD DRAWING IPWEAQ DS-019.
                                                                                      ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.
                                                                                                                                                                                                                                                                                                                                                             4.   ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE WITH
                                                                                3.    NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                    MANAGEMENT PRINCIPLES:
                                                                                                                                                                                                                                                                                                                                                                  STANDARD DRAWING IPWEAQ DS-020.
                                                                                4.    THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING WORKS.                 5.   THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE EROSION
                                                                                                                                                                                                                                                                                                                                                             5.   THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND STRUCTURES.
                                                                                                                                                                                                                    AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA). THE BASIC
                                                                                5.    NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE APPROPRIATE                   PRINCIPLES ARE TO:                                                                                                                       6.   ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                      AUTHORITIES.                                                                                                                   ●    MINIMISE THE AREA OF DISTURBANCE;                                                                                                  7.   THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN ACCORDANCE
                                                                                6.    EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE NECESSARY TO                      ●    CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                                       WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                                                                      SUIT FINAL FINISHED SURFACE LEVELS.                                                                                            ●    MINIMISE EROSION;
                                                                                                                                                                                                                                                                                                                                                             8.   THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF TRENCHES
                                                                                                                                                                                                                     ●    MINIMISE SEDIMENTATION;
                                                                                                                                                                                                                                                                                                                                                                  AND STRUCTURES.
                                                                                                                                                                                                                     ●    PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
                                                                                CLEARING, GRUBBING AND DISPOSAL                                                                                                                                                                                                                                              9.   THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS FOR
                                                                                1.    CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND SEDIMENT                                                                                                                                                                         APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                      CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION OF THESE CONTROL                   CONSTRUCTION PRE-START MEETING:
                                                                                                                                                                                                                                                                                                                                                             10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING STORMWATER
                                                                                      MEASURES.                                                                                                                6.   THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH AS:                                    INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                2.    CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                                ●    KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                                                                                                                                                                                                                                                             11. ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE CONTRACTOR.
                                                                                                                                                                                                                     ●    REQUIRED WATER QUALITY OBJECTIVES;
                                                                                3.    ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.                                                                                                                                                                                                               PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED
                                                                                                                                                                                                                     ●    PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
                                                                                                                                                                                                                                                                                                                                                                 THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER PARTIES.
                                                                                4.    WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.                                                       ●    IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
                                                                                                                                                                                                                     ●    IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;                                                                                 12. UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER BLOCKAGES.
                                                                                5.    CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.
                                                                                                                                                                                                                     ●    REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                                                6.    A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.
                                                                                                                                                                                                                                                                                                                                                             SUBSOIL DRAINAGE
                                                                                7.    CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE REMOVAL
                                                                                      OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                                 SITE INSPECTION AND MONITORING:                                                                                                               13. SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED UNDER ALL NEW KERB IN ACCORDANCE WITH MRTS03.

                                                                                8.    DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL                 7.   CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF CONTROL                                   14. SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                                                      AUTHORITY.                                                                                                                    MEASURES (E.G. SITE FOREMAN).
                                                                                                                                                                                                                                                                                                                                                             15. SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50M.
                                                                                9.    CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN INTERIM                       8.   ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                                                                                                                                                                                                                                                                             16. THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100M.
                                                                                      STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.                                              ●    AT LEAST DAILY WHEN RAIN IS OCCURRING;
                                                                                                                                                                                                                     ●    AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);                                                                           17. THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE PRE-DRAINING OUTLET.
                                                                                                                                                                                                                     ●    WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
                                                                                EARTHWORKS / EXCAVATION                                                                                                              ●    WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                GENERAL:                                                                                                                       9.   CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW
                                                                                1.    ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.                               CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.

                                                                                2.    ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE                     10. CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
                                                                                      UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                          11. WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE MUST BE                                                                                                         -
                                                                                      STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE ENGINEER.                     INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.
                                                                                3.    STOCKPILES SHALL BE COVERED WITH TARPS.                                                                                  12. THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY CORRECTIVE
                                                                                                                                                                                                                   ACTIONS TAKEN.
                                                                                                                                                                                                                                                                                                                                                                                                   NOOSA COUNCIL
                                                                                4.    EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.
                                                                                5.    ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF
                                                                                      EARTHWORKS.                                                                                                              ROAD PAVEMENT
                                                                                                                                                                                                                                                                                                                                                                                                   APPROVED PLAN
                                                                                6.    EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                        GENERAL:                                                                                                                                                                         OPW18/0118 25 SEP 2018
                                                                                                                                                                                                               1.   ASPHALT PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS30.
                                                                                TOPSOIL:                                                                                                                       2.   WHERE APPLICABLE, THE ASPHALT OVERLAY IS TO BE TIED-IN NEATLY TO THE KERB AND CHANNEL FOLLOWING EDGE PLANING.                                                             AS AMENDED BY CONDITIONS
                                                                                7.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY ROOT                 3.   UNBOUND PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS05.
                                                                                      AFFECTED AREAS MUST BE REMOVED.                                                                                          4.   BASE COURSE AND SUB BASE TO BE STEPPED, AT JOINT BETWEEN EXISTING AND PROPOSED PAVEMENT, IN ACCORDANCE
                                                                                8.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR DISPOSED OF.               WITH STANDARD DRAWING IPWEAQ RS-170.
                                                                                      TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                                        5.   ALL PAVING OPERATIONS INCLUDING MATERIAL SUPPLY, CONSTRUCTION PROCEDURES AND TESTING REQUIREMENTS SHALL
                                                                                                                                                                                                                    BE IN ACCORDANCE WITH TMR STANDARDS AND SPECIFICATIONS.
J:\2017\17548ID2_Goodchap_Street_Carpark\4.CADD\#ACAD\17548_GOODCHAP.dwg




                                                                                COPYRIGHT ©                                                                             Associated Consultants   Client                                                                                            Drawn       Verified              Project                                                         Drawing Title                                                   Scale            Sheet Size
                                                                           This drawing is subject to                                                                                                                                                                                              NV          BD
                                                                           copyright in accordance with the
                                                                           agreement between Tod
                                                                                                                                                                                                 N.C. OLIVER                                                                                       Designed    Verified
                                                                                                                                                                                                                                                                                                                                     GOODCHAP STREET, NOOSAVILLE GENERAL NOTES                                                                                       AS SHOWN A1
                                                                           Consulting pty ltd (tc) and tc's
                                                                           client. This drawing shall only be
                                                                                                                                                                                                                                                                                                   NV          BD                    ACCESS IMPROVEMENTS                                                                                                             Drawing Number
                                                                                                                                                                                                                                                                                                   Approved    RPEQ No
                                                                           used for this specific project.
                                                                                                                                                                                                                                                                                                   B. DOWNES   14873                 RDP                                                                                                                                    17548-C002
                                                                           This drawing shall not be used
                                                                                                                                                                                                                                                            Noosa: 07 5449 9600                                                      LOCAL AUTHORITY   NSC
                                                                                                                                                                                                                                            Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                                                   Signed                            MCU APPROVAL                        HORIZ DATUM                                 0     10     20    30     40    50       60     Sheet             Revision
                                                                           for construction until marked as                                                                                                                                          PO Box 61, Noosaville, QLD 4566
                                                                                                                 A   14.09.18 RESPONSE TO INFORMATION REQUEST    NV                                                                                                                                                                  ROL APPROVAL                        VERT DATUM
                                                                           'issued for construction' in the
                                                                           revision description.                Rev Date Revision Description                   Drawn
                                                                                                                                                                                                                                          [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                            ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                          14.09.18   OPW APPROVAL      OPW 18/0118       RL DATUM                                        MEASUREMENT BAR - INCREMENTS IN mm
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             2 of 5       A

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans OPW18_0118 .pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.