GENERAL COMMITTEE MEETING AGENDA 18 JUNE 2018
c. The exterior finish of the shipping container must be painted in muted tones or
clad in a muted material.
The appearance of all structures, including the shipping container, must be
maintained at all times.
Nature and Extent of Approved Use
4. The use of new undercover dining area must not operate outside of the hours 7am –
10pm and be used a maximum of three days per week.
5. Patrons in the new undercover dining area must not exceed 60 persons.
6. Patrons on the existing deck dining area must not exceed 40 persons.
7. The new undercover dining and link-way areas must be in accordance with the
approved plan, with no more than 192m2 used for dining.
8. Service vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 6am to 6pm Monday to Saturday, and
not at all on Sundays or public holidays.
Noise
9. External speakers or amplified music are not permitted.
10. Refuse disposal, particularly glass bottles and the like, must be considerate of noise
at all times.
11. Management must ensure patrons leave the premises and street frontage promptly
after nightly closing time and do not mingle or otherwise cause noise nuisance.
12. Noise emissions from any new air-conditioning and refrigeration equipment
associated with the development shall comply with the following requirements:
a. 7am to 10pm: Background + 5dB(A)
b. 10pm to 7am: Background + 3dB(A)
WASTE
Waste Disposal
13. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet must be designed to prevent storm water entry to the sewerage system. This
can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
0.5m²), or alternatively the waste area can be roofed, or any other design approved
by Council.
14. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
15. Public bins must be provided to reduce littering. All bins provided must be for refuse
and recycling and be decanted into the bulk bins by the site operators.
ENGINEERING
Site Access and Driveways
16. Sealed access driveways must be maintained from Main Street to all parking and
manoeuvring areas of the development.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.