Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 3 - Infrastructure Agreement · 132007.12.8

Attached to the e-mail 132007.12.8 - Response to Information Request.

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                .18

                                          SCHEDULE 2

                               ADDITIONAL WORKS BY APPLICANT

       The Applicant shall obtain an operational works permit and carry out the following
       works in respect of part of the Council reserve adjoining the Property to the south
       (Land Do onella Bushland Reserve Lot I on RP802360) as shown hatched on Drawing
       No. GP 2.02 D, , forming part of this Schedule 2. The works required to be undertaken
       within the hatched area of the Council reserve shown on Drawing No. GP 2.02 02,
       also forming part of this Schedule 2, will be as follows:

       a, Remove all gravel fill from the hatched area;

       b, Remove all stormwater pipes and outlets from the hatched area;

       c. Remove the timber retaining wall structure at the edge (as shown) of the hatched
               area;


       d. Remove the Rotunda structure (as shown), including all footings, from the
               hatched area;

       e. Remove all debris from the hatched area;

       f. Reinstate the hatched area with top soil and turf, this being the previous
               condition of the land;

       g. Provide for sediment and erosion control measures as required to stabilise the
             hatched area during construction and until the turf is established;

       h* Ensure all new energy dissipaters associated with stormwater treatment from the
            development are located within the subject land and not within the hatched area;

               Ensure suitable treatments are provided to prevent stormwater from the
               development causing scouring when entering the hatched area;

               Provide an appraisal by a suitably qualified and experienced arborist, about the
               condition of the trees at the edge of the hatched area where works have
               occurred within the root zones, and undertake replacement planting if required;
               and

       Undertake the works identified in paragraph I in accordance with any necessary
       approval.




Legal147541127_I

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Infrastructure Agreement.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.