Skip to the record
Search everything, all in one place.

Original source · versioned page text

2017-01-16 General Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                16 JANUARY 2017


      Earthworks and Retaining Walls
37.   All excavation/filling and associated retaining structures must be undertaken in accordance
      with an Operational Works approval, and contained entirely within the subject site unless
      written permission from the respective landowner(s) is provided to Council.
38.   All retaining walls must be designed and constructed in accordance with the planning scheme
      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
      safety fence.
      Damage to Services and Assets
39.   Any damage caused to existing services and assets as a result of the development works
      must be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
           or
      b.   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval.




REPORT
1.    PROPOSAL
The proposed development originally sought to seek a number of additions to the existing Tewantin
Noosa RSL (RSL) over a number of stages. Following discussion with the applicant about the scale
of the development, the applicant amended the application and the proposal plans to provide for
Stage 4 only, however the proposed extensions remain substantial.
The proposed new development is primarily over the existing at ground carparking area fronting
Doonella Street and Pelican Street and includes the area of land currently occupied by Noosa
District Community Radio building, which fronts Pelican Street.
Stage 4 of the development includes an extension to the existing gaming area and provides for a
new delivery and service yard, with an additional 683.62m² of GFA being proposed. A new
basement carpark area with provision for 125 parking spaces is also to be provided over the
existing at ground parking area (refer Figure 1, below).




                                                                                   Page 10 of 146
Log in to download the original file

2017-01-16 General Committee Agenda(PDF, 15MB).pdf · 15.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.