Original source · versioned page text
2017-01-16 General Committee Agenda
The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 JANUARY 2017
The character of the immediate area surrounding the subject land is mixed with varying building
forms and some open space. Importantly, a number of dwellings remain on the southern side of
Doonella Street, directly opposite the existing and proposed extensions to the RSL development.
These dwellings are older and exhibit many of the light weight architectural features that are
reflective of the Tewantin Locality generally.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
State Planning Policies;
the South East Queensland Regional Plan;
State Planning Regulatory Provisions;
any Structure Plan or Master Plan in place for declared areas;
any Preliminary Approval Overriding the Planning Scheme for the land;
the Planning Scheme for the local government area; and
any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed below.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy, April 2016 is applicable to this application, in terms of the following
State interest:
State interest – water quality
The subject land has an area greater than 2,500m² and will have an impervious area greater than
25%. The applicant has addressed the matter of water quality, which is discussed further below.
The proposed development meets the requirements of the State Planning Policy in terms of
managing water quality from the development.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint under the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The subject land is located in the Tewantin & Doonan Locality and is included in the Community
Services zone. The application made is for an ‘undefined use’. This is because the existing and
proposed uses collectively do not fit neatly with any of the uses under the Noosa Plan, these being
a combination of community and entertainment and dining uses.
Page 15 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.