Original source · versioned page text
2017-01-16 General Committee Agenda
The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 JANUARY 2017
Outdoor Lighting Devices
23. Lighting associated with the use must be designed, sited, installed and tested to comply
with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive
effects of outdoor lighting” using a control level of 1.
24. Certification must be submitted to Council from a qualified person which certifies that
all outdoor lighting devices comply with the requirements of this Decision Notice at the
time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a qualified
person is:
a. a Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years current
experience in the field of outdoor lighting.
Odour
25. Odour emissions must be managed in accordance with the Noise and Odour
Assessment Noosa Micro Brewery prepared by GHD Pty Ltd and dated 17 August
2016.
Waste Disposal
26. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap,
hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
designed to prevent storm water entry to the sewerage system. This can be achieved
with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
the waste area can be roofed, or any other design approved by Council.
27. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
OPERATIONAL WORKS – OPW16/0209
Approved Plans
1. Development undertaken in accordance with this operational works approval must
generally comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
02 of 04 - K Ground/Site Plan, prepared by Ace Space Design 25.10.16
Project No: 15.253
26232 – 0W3 Operational Works: Earthworks & Retaining Wall Plan, Aug 2016
prepared by SCG Consulting Engineers
26232 – 0W4 Operational Works: Driveway & Access Plan, prepared Aug 2016
by SCG Consulting Engineers
LD 1 A Specifications, prepared by Anembo Consultants 8.9.16
LD 2 A Details, prepared by Anembo Consultants 8.9.16
LD 3 A Schedules & Legend, prepared by Anembo 8.9.16
Consultants
Page 32 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.