Original source · versioned page text
2017-01-16 General Committee Agenda
The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 JANUARY 2017
Plan No. Rev. Plan/Document Name Date
LP 1 A Landscape Plan, prepared by Anembo Consultants 8.9.16
LP 5 A Landscape Plan, prepared by Anembo Consultants 8.9.16
Landscaping Works
2. Four (4) suitable native trees with a pot size of 45 litres must be planted evenly spaced
to the garden adjoining the front boundary (between the entry and exit points).
3. All landscape works must be constructed and undertaken generally in accordance with
the approved plans and conditions detailed in this Decision Notice.
4. Turfed areas within the Rene Street road reserve must:
a. Join smoothly and level with adjoining surfaces.
b. Be free of disease, pest, weeds, rock and debris.
5. Landscape works must:
a. In accordance with Planning Scheme Policy PSP 3 Landscaping Plants and
Guidelines.
b. Take all measures to prevent Fire Ants (or any stages of the fire ant life cycle)
entering the work site.
c. Take all measures to prevent Myrtle Rust infection.
d. Not obstruct overland flow paths and must include adequate drainage to
minimise ponding. Mulch or any floatable material must not be located in swales,
overland flow paths or around grated drains.
e. Not encroach onto kerb and channel, footpaths, pedestrian or vehicular/
circulation areas.
f. Not restrict access to service meters.
g. Delineate all garden to grassed area interfaces with a hard edge.
h. Ensure sales signage and ancillary infrastructure is not installed within the road
reserve.
i. Ensure permanent irrigation is not installed within the road reserve.
j. Ensure all weeds and debris are removed from planting areas prior to planting.
k. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free
of foreign matter including anthropogenic waste, rock, soil / sediment
contamination and is applied to ensure a minimum 100mm depth once settled.
6. Soil provided for landscaping must provide for the site specific vegetation performance
objectives.
7. All landscape works must be completed prior to the commencement of use.
PRIOR TO COMMMENCENT OF WORKS
Engineering
8. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
a. The name, contact details and ACN for the supervising Registered Professional
Engineer of Queensland (RPEQ) and Principal Contractor.
Page 33 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.