Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2017-01-16 General Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                16 JANUARY 2017


         e.    Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless
               a written approval is obtained from Unitywater/Telstra and submitted to Council.
   21.   Pavement design for privately owned works must be undertaken in accordance with
         the relevant standards and be designed and constructed to comply with the Disability
         Discrimination Act (DDA), Access to Premises Standard and relevant sections of
         AS1428 Design for access and mobility. Structural integrity of the driveway and car
         park areas will remain the responsibility of the property owner/developer and must be
         certified by an RPEQ.
         Earthworks
   22.   All earthworks associated must be undertaken in accordance with the provisions of AS
         3798 Guidelines on Earthworks for Commercial and Residential Development, with
         geotechnical supervision and testing undertaken in accordance with Section 8 of the
         Standard, and to a minimum of ‘Level 2’ as defined in Appendix B and the approved
         plans.
   23.   All Earthworks and construction works must be carried out taking into consideration the
         protection of any existing above and below surface services, and the stability and
         protection of fences and any buildings and structures on the adjoining properties.
         Damage to Services and Assets
   24.   Any damage caused to existing services, streetscape and assets (including kerb and
         footpath) as a result of the development works must be repaired at no cost to the asset
         owner at the following times:
         a.    Where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
         b.    Where otherwise, upon completion of the works associated with the
               development.
         Any repair work which proposes to alter the alignment or level of existing services and
         assets must first be referred to the relevant service authority for approval.
         Erosion & Sediment Control
   25.   A construction hold point must be established with a council delegate and supervising
         RPEQ prior to commencement of cut to fill earthworks for each stage of the
         development. The hold point must be held as soon as reasonably practical and prior to
         the first rain event forecast following initial tree clearing or removal of soil stabilising
         material for each stage. At the hold point inspection, all required sediment basins,
         drains and bunds to divert waters away from disturbed soil or soils about to become
         exposed through cut to fill activities must be installed. All areas that will not require
         earthworks in the imminent cut to fill operation must be stabilised to prevent
         entrainment of sediments into receiving waters.
   26.   Cut to fill earthworks must not commence until after the Supervising RPEQ has certified
         that all installed erosion and sediment controls required by this approval are sized in
         accordance with conditions of the approval and the written acceptance of the
         certification is provided to the supervising RPEQ by Council officers.
   27.   Offsite run-off must be diverted around exposed soils on the site without entraining
         additional sediments. Discharge from measures to divert the offsite water must not
         cause run-off impacts to other properties. Measures installed to divert the upstream
         water must be designed and certified by the supervising RPEQ and installed prior to
         commencement of bulk earthworks.




                                                                                    Page 36 of 146
Log in to download the original file

2017-01-16 General Committee Agenda(PDF, 15MB).pdf · 15.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.