Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2017-01-16 General Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                               16 JANUARY 2017


         f.    Establishment of a communication protocol with the adjoining owners
               (particularly the users of the shared access driveway) and any other affected
               parties to advise of construction times, impacts on traffic and services and any
               other relevant issues.
         g.    Identification of communication and complaint management procedures
               including:
               i.    Contact details for the on-site manager.
               ii.   Dispute resolution procedures.
   15.   Any changes to the details associated with the supervising RPEQ or Principal
         Contractor during construction, must be notified to council in writing within five business
         days of the change occurring.
   16.   Any alteration to existing services or conflict between the development and an existing
         or proposed service must be referred to the relevant service authority for determination
         prior to commencement of works.
         General
   17.   The developer must meet any costs to repair damage to any Council asset during
         construction, where damage is a result of the development works. Damage to assets
         must be repaired immediately where it creates a hazard to the community. In
         circumstances where the damage does not create a hazard to the community, it must
         be repaired immediately on completion of the works associated with the development.
   18.   All works must be supervised by a Registered Professional Engineer of Queensland
         (RPEQ) who is independent of the Developer and Principal Contractor, and they must
         certify that all works conform to the Operational Works permit. Where municipal works
         are involved, such confirmation must be submitted for the respective hold points prior
         to any site inspection by Council Officers.
   19.   All works must be constructed and work procedure undertaken in accordance with:
         a.    The approved plans and conditions detailed in this Decision Notice.
         b.    All relevant Noosa Council Planning Scheme Policies, standard drawings,
               standard specifications and guidelines, particularly PSP 5 – Engineering Design
               Standards – Roads, Drainage and Earthworks.
         c.    The latest version of the Healthy Waterways document “Water Sensitive Urban
               Design Technical Design Guidelines for South East Queensland” for all water
               quality devices to be constructed on site.
         DURING CONSTRUCTION
         Driveways and parking
   20.   The following must be complied with during the construction of the required driveways
         and parking areas:
         a.    The driveway must be constructed so as not to concentrate stormwater runoff or
               ponding onto other properties and/or the road verge.
         b.    Parking areas must be line marked in accordance with the approved plans
         c.    For public safety, the finish levels of crossover must ensure smooth transition to
               existing surfaces such as the grassed verge and existing concrete driveway.
         d.    Where applicable, underground service conduits for water supply, electricity and
               any other services must be provided as part of the access driveway works.




                                                                                   Page 35 of 146
Log in to download the original file

2017-01-16 General Committee Agenda(PDF, 15MB).pdf · 15.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.