GENERAL COMMITTEE MEETING AGENDA 16 JANUARY 2017
f. Establishment of a communication protocol with the adjoining owners
(particularly the users of the shared access driveway) and any other affected
parties to advise of construction times, impacts on traffic and services and any
other relevant issues.
g. Identification of communication and complaint management procedures
including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
15. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five business
days of the change occurring.
16. Any alteration to existing services or conflict between the development and an existing
or proposed service must be referred to the relevant service authority for determination
prior to commencement of works.
General
17. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the development.
18. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal works
are involved, such confirmation must be submitted for the respective hold points prior
to any site inspection by Council Officers.
19. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines, particularly PSP 5 – Engineering Design
Standards – Roads, Drainage and Earthworks.
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
DURING CONSTRUCTION
Driveways and parking
20. The following must be complied with during the construction of the required driveways
and parking areas:
a. The driveway must be constructed so as not to concentrate stormwater runoff or
ponding onto other properties and/or the road verge.
b. Parking areas must be line marked in accordance with the approved plans
c. For public safety, the finish levels of crossover must ensure smooth transition to
existing surfaces such as the grassed verge and existing concrete driveway.
d. Where applicable, underground service conduits for water supply, electricity and
any other services must be provided as part of the access driveway works.
Page 35 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.