TABLE 4.9: 10% AEP FLOWS – EXISTING VS MITIGATED SCENARIOS
Scenario 10% AEP
Existing – Pipe Capacity (m3/s) 0.261
Developed (m3/s) 0.314
Mitigated (m3/s) 0.258
Difference (m3/s) -0.003
4.3 Flows South to Starboard Avenue
From the development site there is approximately 0.8 ha of catchment (refer Figure 2.4) that would report south down Starboard Avenue in
events where the design capacity of the drainage network has been exceeded (i.e. minor design storm of 10% AEP). As mentioned earlier,
the original drainage design completed by TOD Consulting identified that capacity of the piped network reporting north from Catchment 1/3
(refer Figure 2.3) is 0.24m3/s in the 10% AEP. Flows in excess of this are considered to surcharge and report south to Starboard Avenue.
From this it is considered that the gap flow, being the difference between minor (10% AEP) and major storm (1% AEP), would report, as
overland flow, south down Starboard Avenue. Assessment of the pre-development flow reporting from this catchment, south, down
Starboard Avenue in the 1% AEP is approximately 0.37m3/s. The gap flow in the post-development scenario is 0.13m3/s (0.37 – 0.24m3/s),
which is less than the pre-development scenario. In the 10% AEP, the flow reporting south would be 0m3/s, hence, non-worsening is
achieved.
Pipe Flow North
(0.24m3/s)
0.8ha
Gap Flow
Report South
Figure 2.4: Catchment of Gap Flow Reporting South down Starboard Avenue
73 EUMUNDI - NOOSA ROAD, NOOSAVILLE I BBNE00529_0002_0001-REP-001-2 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.