Original source · versioned page text
REPS - Updated SWMP
Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
CONTENTS
1. Introduction 1
1.1 Project Purpose and Scope 1
1.2 Site Characteristics 1
1.3 Project Data and Guidelines 3
1.4 Performance Criteria 3
1.5 Previous Approval 3
2. Information Request 4
3. Stormwater Quality Management 6
3.1 Overview 6
3.2 Operational Phase 6
3.3 Model Development 6
3.3.1 Catchments 6
3.3.2 Climate Data 7
3.3.3 Modelling Parameters 7
3.4 Treatment System 9
3.4.1 Treatment Train Sizing 9
3.5 Water Quality Model Results 10
3.6 Treatment Train Operation and Maintenance 11
3.6.1 Construction & Establishment 11
4. Stormwater Quantity Management 12
4.1 Existing Detention Basin 12
4.1.1 Existing Scenario 12
4.1.2 Developed Scenario (unmitigated) 13
4.1.3 Mitigation Scenario 15
4.1.4 Existing Detention Basin – Climate Change 16
4.2 Townhouse Site 16
4.2.1 Catchment 16
4.2.1 Results 17
4.3 Flows South to Starboard Avenue 18
5. Conclusion 19
6. QUALIFICATIONS 20
Appendix A: Proposed Site Layout Plan 21
Appendix B: Preliminary Engineering Design Plans 22
Appendix C: WBNM Results Summary 23
73 EUMUNDI - NOOSA ROAD, NOOSAVILLE I BBNE00529_0002_0001-REP-001-2 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.