Original source · versioned page text
BUSHFIRE HAZARD ASSESSMENT AND MANAGEMENT PLAN v2 - Coveys Road TINBEERWAH (1)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment and Management Plan v2 NCES REF: J000545 Lot 2, 4 & 5 on RP172460 & Lot 7 on RP895754 66, 82 & 98 Coveys Rd & 39 Tinbeerwah Rd, Tinbeerwah • In accordance with Assessment Benchmark 5 of the SPP Bushfire December 2019, APZ’s are designed to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous. 6.3 Water Supply The availability of a reliable water supply for firefighting purposes is a vital tool in the defence of bushfire impact. The site is not connected to a reticulated water supply. There is no water supply assessment benchmark under the SPP Bushfire 2019, therefore the provisions of the Noosa Plan 2006 will apply, which require: • An accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and • A water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting (50mm male cam lock) connected to the water supply (other than where the water supply is in a swimming pool or dam). 6.4 Fire Breaking Trails The provision of fire breaking trails within a site located in a bushfire prone area offers an important bushfire defence measure to assist in reducing the risk and severity of bushfire ingress onto and through a site. Assessment Benchmark 4 of the State Planning Policy – state interest guidance material states: Where reconfiguring a lot creating additional lots for the purpose of residential development and a reticulated water supply is not provided: To ensure safe access and egress and operational space for rural fire-fighting vehicles, a fire trail and working area is provided that separates the new residential lot or development footprint plans from adjacent mapped medium, high or very high potential bushfire intensity areas and is designed and constructed in accordance with the design parameters in Table 4. To ensure adequate access is available to the interface of bushland within the lots, and to mitigate unforeseen regrowth on bordering lots, a fire access trail is to be constructed and maintained about the perimeter of each lot (excluding within proposed covenant areas) which satisfies the design parameters detailed in Assessment Benchmark 4 Table 4 to the SPP Bushfire 2019, which is replicated below. © 2022 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.