Original source · versioned page text
BUSHFIRE HAZARD ASSESSMENT AND MANAGEMENT PLAN v2 - Coveys Road TINBEERWAH (1)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment and Management Plan v2 NCES REF: J000545 Lot 2, 4 & 5 on RP172460 & Lot 7 on RP895754 66, 82 & 98 Coveys Rd & 39 Tinbeerwah Rd, Tinbeerwah In addition, where the fire break trail is discontinuous it shall provide: • a suitable ‘T’ head turnaround area which allows a 3-point turn to be enacted to ensure vehicles can exit the area in a forward gear. 6.5 Roads and Driveways The application is for a boundary realignment and no new gazetted roads are proposed. Access to Lot 12 is to be provided directly from Coveys Road to the south and to Lot 8 and 9 from Tinbeerwah Road to the east. All building envelopes are located 10m from the boundary and therefore access driveways are not anticipated to exceed 60m in length. The driveways are located within existing open areas which are flanked by low threat conditions. 6.6 Landscaping and Regrowth Existing and future landscaping about the site should avoid increasing the potential for bushfire hazard. Assessment benchmark 5 of the SPP Bushfire 2019 seeks that the site layout places the landscape and open spaces within the site between premises and adjacent mapped medium, high or very high potential bushfire intensity areas. This landscaping and open space comprises protective landscape treatments that: 1. Comprise only low threat vegetation, including grassland managed in a minimal fuel condition, maintained lawns, golf courses and cultivated gardens; or 2. Are designed to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous. To reduce the potential for bushfire impact to buildings, structures and occupants as a result of future regrowth and landscaping works within the site, it is recommended: • Any landscaping within the nominated APZ or fire break trail footprint satisfies Assessment benchmark 5 of the SPP Bushfire 2019, including the low threat vegetation criteria prescribed in section 2.2.3.2 of AS 3959:2018 or later iterations thereof, where applicable, and be planted as discrete isolated clumps of low flammability vegetation aligned parallel the building to aid in interception of ember and smoke attack and not perpendicular and in a manner which could transmit fire toward the building; • No woody mulch is used within 2m of buildings; • No trees or shrubs are retained within 10m of the buildings; • Beyond 10m, any trees desired to be retained are to be delimbed to 4m height and no limbs are to extend to within 6m of the roof line of buildings; • Future landscaping works/plantings maximise the use of locally indigenous, low flammability species and or low-density plantings of suitable open forest /woodland species with low bark shedding characteristics. Landholders should consult their local native plant nursery for suitable species selection and seek guidance from the SCC Planning Scheme Policy for Development Works for selection of non-fire promoting vegetation species. 6.7 General Property Maintenance The undertaking of an appropriate level of property maintenance throughout the year, and in particular prior to the fire season, can significantly reduce the severity of fire impact upon a site. Queensland Fire and Emergency Services recommend the following general actions be undertaken to prepare for the fire season: Structure • Clear leaves, twigs, bark and other debris from the roof and gutters. • Purchase and test the effectiveness of gutter plugs. • Enclose open areas under decks and floors. • Install fine steel wire mesh screens on all windows, doors, vents and weep holes. • Point LPG cylinder relief valves away from the house. © 2022 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.