07/1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published] · 142007.1294

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

    
 

Form 1 Development Application

IDAS Assessment
Checklist —

(Formerly the “Referrals Checklist”)

 
 

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. _. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the

: “Referrals Checklist’, The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. — Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (é.9. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensiand Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires. assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager' for the application.
4. — Therefore, the completion of afl questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of. Parts A &Bonly).
5. tis the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

eo. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when Identifying if the
application triggers referral coordination?.

9. To assist you in answering the following questions a series of guidés are available free from the IPA website www.ipa.gid.gov.au. Guide 25 explains the role of the [DAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form # that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

www. ipa.qid.gov.au. .
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regutation 2006.

 

 

 

 

Environmentally refevant activity 1. The se involves: (tick applicable box/es)

For more information refer to Guide 4. C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
east en of the aye Qi, has not been made - complete Part G of Form 1

administering auth (i) amobile or temporary ERA for which a code of environmental compliance has not been
ian entity, other than the. administering made - complete Part G of Form 1

authority, is the assessment manager for the [XI (iii) none of the above

application, the administering authority fs a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
wil also require completion of Part Kz of Form 1
for approval where an allocation under the Water
Act 2000s required.

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable fo assessment manager)
- DATE RECEIVED REFERENCE. NUMBERIS ‘ . |

 

 

 

 

1 The assessment manager is tesponsibte for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local govemment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisherles (for a delegated ERA).

Page 1

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published].pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.