Original source · versioned page text
Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
5 STORMWATER MANAGEMENT A stormwater management plan has been prepared under separate cover. A summary of the stormwater management plan is provided as follows: Water quality objectives have been demonstrated to be achieved through the implementation of a treatment train that incorporates gross pollutant traps/filter bags and a ZPG Storm filter system to reduce total suspended solids (TSS), total phosphorus (TP), total nitrogen (TN) and gross pollutants. Appropriate erosion and sediment control measures will be required to be prepared and implemented on site during construction activities in order to minimise water quality impacts during the construction phase. The stormwater quantity management assessment demonstrates that overland flow within the network is reduced as a result of this development by the inclusion of the pipe network on the development site. Gateway Drive will therefore benefit as result of reduced overland flow contributing to the road. A PC-drain analysis determined that the proposed internal stormwater network was sufficient to accommodate 10 year ARI flows. Notwithstanding the assessment, further detailed design of the internal stormwater system and connection to the existing pipe network will be required to be undertaken as part of the future Operational Works application for the development. 6 SEWERAGE Operational Works drawings obtained through Councils’ online development service show approved plans for the construction of a sewer manhole serviced by a DN160 PE100 pipe in the northern corner of the site. Preliminary site investigations confirmed that this has already been constructed. 7 WATER SUPPLY Operational Works drawings obtained through Councils’ online development service show approved plans for the construction of a 50mmØ house connection and 150mmØ fire service connection located in the south west corner of the site. 205-002-003R Mogpropmanagement Pty Ltd Page 4 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.