Original source · versioned page text
Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
8 SITE ACCESS A Traffic Report has been prepared under separate cover. A summary of the Traffic Impact Assessment is provided as follows: The all movements’ access on the western boundary of the site has shown minimum sight distance requirements as per Austroads Guide to Road Design – Part 4A: Unsignalised and Signalised Intersection. This site access was originally proposed as a left-in left-out access and was considered generally unacceptable in the pre-lodgement meeting. It has since been reduced to a left in only and therefore not required to meet intersection sight distance requirements with the following supporting information; The existing road is required to provide stopping sight distance SSD; Gateway Drive has a low operating speed due to the geometry of the road and proximity to the roundabout; A keep clear zone will be provided within the site with adequate storage for a 12.5m HRV to ensure no disruption is caused to through traffic; Maintaining two site access points will eliminate the requirement of trucks to perform internal turnaround maneuvers or reverse into the road; Adequate turn path provisions are provided. 9 ELECTRICITY AND COMMUNICATIONS SUPPLY The DBYD information (attached at Appendix C) and a phone call to Energex confirmed that the site has multiple power connection options including overhead and underground power. The selection of the appropriate connection requires detailed information on the sites expected power usage and will be defined at the operational works stage of this project. The DBYD information also revealed the location of communication network infrastructure with Optus underground network cables running along the northern side of Eumundi-Noosa Road with an Optus pit located to the west of the intersection of Gateway Drive and Eumundi-Noosa Road. The location of this communications infrastructure is attached at Appendix C. 205-002-003R Mogpropmanagement Pty Ltd Page 5 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.