Performance outcomes Acceptable Outcomes
3. ensuring stock piling, storage and vehicle
parking occur outside the areas of
vegetation to be retained.
AO12.6
Where clearance of habitat is unavoidable, once
the area disturbed by the works is re-established,
replacement habitat is planted in proximity of the
works to create native fauna habitat suitable for
the area and maintained for the life of the works.
PO13 AO13 Not applicable
Road infrastructure is constructed to minimise Road infrastructure is constructed in accordance
adverse environmental impacts, including from with Council’s Planning Scheme Policy PSP6
run-off and erosion. Engineering Design Standards – Roads,
drainage and earthworks