Original source · versioned page text
Transport Code
External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
External Works and Infrastructure
PO14 AO14 Complies
Development is provided with external works— Where not already existing, the following The infrastructure components outlined in
infrastructure components are provided the acceptable outcomes will be provided
1. along the full extent of the frontage of the site at the frontage of the site— to the development where not already
to an appropriate standard having regard to existing. Refer to the traffic impact
the specified function of the road; and 1. full width sealed road; assessment in Appendix G.
2. provided beyond the site’s frontage if required. 2. concrete kerb and channel
where appropriate;
3. forming and grading to footpaths;
4. vehicular kerb and footpath
crossings;
5. a constructed bikeway;
6. a constructed footpath;
7. a constructed carriageway;
8. required alterations to public
utility mains, services or
installations;
9. construction of any required
alterations to public utility mains,
services or installations;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.