Original source · versioned page text
Transport Code
Performance outcomes Acceptable Outcomes
PO17 Complies
Staged development is planned, designed and constructed No acceptable outcome Each stage will be design and
to ensure that— provided constructed to ensure that it is self
sufficient in its own right. Each stage will
1. each stage of the development can be also ensure that:
constructed without interruption to services • Interruption of services will not
and utilities provided to the previous stages; adversely impact previous or
2. the infrastructure provided is capable of future stages.
servicing the entire development; and • Infrastructure is capable of
3. the materials used are consistent throughout servicing the entire development
the development. site.
• Materials are consistent
throughout the development.
• On site manoeuvring will be
available within each stage.
You have reached the end of the page.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.