Transport Code
Performance outcomes Acceptable Outcomes
10. stormwater drainage works; and
11. installation of electrical conduits.
PO15 Complies
Any alterations or repairs to infrastructure as a result of the No acceptable outcome provided Alterations and repairs will be undertaken
development are made at no cost to Council. where necessary and at no cost to Council
(except for trunk infrastructure which is
anticipated to be offset against the relevant
infrastructure charges).
PO16 Complies
Road infrastructure is proven to be suitable for its use prior No acceptable outcome provided
All proposed road infrastructure will be
to Council accepting the dedicated asset.
suitably assessed by Council through the
detailed design stages during Operational
works.
Staged development Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Staged development