Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix 3 - Stormwater quality management plan

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Operational Management and Maintenance Manual for Stormwater Quality Improvement Devices      CC-3668



3. GROSS POLLUTANT TRAPS
3.1.      Background
Gross pollutant capture devices serve as primary stormwater treatment devices in a stormwater
treatment train as they target litter, coarse sediments and other large particles (larger than 5mm).
This pre-treatment of stormwater flows can help to reduce the risk of secondary or tertiary treatment
devices, located downstream, from being smothered, affecting the treatment performance and
effective service life.

3.2.      Inspection and Maintenance
Gross pollutant traps will be installed to the top of all inlet pits within the development. Regular
inspection and maintenance is required to ensure the traps do not become blocked from sediment,
debris or litter. The storage capacity of the gross pollutant trap has been sized to ensure that the
maintenance (cleanout) frequency is not greater than once every 3 months.

Inspection and maintenance of the gross pollutant traps should be undertaken as per the manufacturer’s
recommendations and guidelines. At a minimum, at least three inspections should occur in the period
between October and May each year. Inspections should not be made less than 24 hours and not
more than 72 hours after the cessation of rainfall if the total rainfall on any day exceeds 30mm.
Litter, debris and sediment should be removed from the gross pollutant traps approximately every 3
months.




                                                                                                    3
Log in to download the original file

Appendix 3 - Stormwater quality management plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.