Council archive · source document
10/0515 - Lot reconfiguration (4 to 2) [As Published] · 152010.515
2
ee I re I cng te
Appendix D: Reconfiguring a Lot Code
03 No additional
lots are created within the Lake-
-No solution provided.
Not / Applicable
for a neighbourhood with a strong and positive identity
through—
a) legible streets and open space networks;
b) integrating prominent site features, including landmarks,
native vegetation and views into the design;
c) the location of community, retail and commercial facilities
at focal points either within convenient walking distance for
residents where the development is urban settlement or
within reasonable vehicular proximity;
d) the location of lots intended for-urban settlement within
proximity of retail and commercial facilities;
e) shared use of public facilities by adjoining communities;
f) enhancement of personal safety and minimisation of
potential for crime, vandalism and fear by maximising
opportunities for casual surveillance of public spaces; and
[_g) establishment of a sense of place.
O5 House site areas are—
a) located at least 50m from any land including within a
-national park, conservation park, .state forest reserve,
nature refuge, coordinated conservation area or wilderness
area; and
b) not located on steep slopes.
Macdonald Water Supply Catchment identified on Overlay The
Maps OM3.5 and OM9.5. .
. 14.186 Lot layout
04 Subdivision of land for residential development provides | $4.1 Lots are arranged to front streets and public open space; | Complies
AND
$4.2 Rear lots have views over public open space; AND
$4.3 Lots intended for urban settlement are located within 1km
of retail or commercial uses or land within a commercial zone.
No solution provided.
variety in residential streetscapes.
06 Lots for residential development are designed to ensure | $6.1 A variety of lot sizes and shapes is provided-within the
/ Subdivision. oN,
, . {the existing and proposed use.
| Complies
Both proposed lots front streets and
are in close vicinity to retail and
commercial uses.
The site is near park and conservation
land.
Complies
Lot size and shape are appropriate for
O7 The street network—
of each type of street and encourage driver behaviour,
speeds and traffic volumes that are safe and appropriate to
that function;
$7.1 Where involving the construction of a new road, -road
a) has design features, which convey the primary function | planning and design supports the hierarchy and functional
aspects identified in Sections 2 and 3 of PSPS Engineering
Design Standards — Roads, Drainage and Earthworks; AND
$7.2 Road and pathway planning and design is in accordance
ay
CadCon Surveying & Town Planning
Page 2 of 11
Not Applicable
‘The proposed reconfiguration does not
involve the construction of a new road.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0515 - Lot reconfiguration (4 to 2) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.