Council archive · source document
10/0515 - Lot reconfiguration (4 to 2) [As Published] · 152010.515
Appendix D: Reconfiguring a Lot Code O09 The subdivision layout is designed to facilitate linkages with adjoining sites in the immediate area. O10 Where the lots are to be used for Industrial business or Commercial business uses, the layout provides for appropriate buffer areas, to mitigate possible impacts on nearby residences or other noise sensitive uses f} have holding rails for cyclists at the intersection of district collector, subarterial and arterial roads that are positioned in accordance with Australian Standard 1742.9:2000 — Manual of Uniform ‘Traffic Controi Devices Bicycle Facilities, andAUSTROADS Part 14 Bicycles Section 9; g) have marked bicycle lanes, bicycle awareness -zones or storage boxes; and h) Include lighting to pedestrian and cycle pathways to local government requirements and in accordance with Australian Standard 1583.1 Road Lighting — Pedestrian area (Category P) lighting. $9.4 Where there is no relevant approved. master plan, concept plan, or site analysis plan, subdivision design incorporates future road, , street,-cycleway and pedestrian. path and open space connections to adjoining sites. No solution provided. tequirement. Not Applicable The telecommunication use already Not Applicable The proposal is not of a scale or intensity to necessitate this exists and no further buffering is necessary. O17 For lots in the Rural Settlement Zone—a sealed access to the nearest urban settlement is available. No prescribed solution. Not Applicable The site is located in the Detached Housing Zone. Vr, wpa CADSR me EO 14.187 Water supply for fire fighting O12 An adequate and accessible water supply is provided | $7 for fire fighting purposes. $12.2 Facilitate the connection of fire services that comply with $12.1 For development in a water service area, water mains within the development shall comply with the: a) Queensland Water Resource Commission - Guidelines for Planning and Design of Urban Water Supply Schemes; and . b) Australian Standard 2419 and the Water Providers Network: Model Criteria; AND the requirements of the Building Code of Australia. 14.188 Energy efficiency = 013 The street and lot orientation facilitates the construction of energy efficient buildings that respond to the local climate conditions. AND where the long axis faces true North or is no more. than 20 $13.1. For Community Title Development:or urban residential development each lot contains a rectanguiar house site area CadCon Surveying & Town Planning So Page 5 of 11 Complies Adequate and accessible water supply is provided for fire fighting purposes. Complies ' Proposed lot 1 is fully developed and ‘Proposed Lot 2 is of sufficient size to
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0515 - Lot reconfiguration (4 to 2) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.