Council archive · source document
10/0515 - Lot reconfiguration (4 to 2) [As Published] · 152010.515
wee
. Appendix D: Reconfiguring a Lot Code
-a) maximise solar access to the north in winter;
_015 Each lot is capable of being serviced by appropriate
levels of—
CRE a, pM agers
‘a) meets the needs of users;
“| surrounds, including visual amenity and native vegetation,
014 For ‘residential development, the subdivision design
provides for the maximum practicable number of lots with
house site areas that—
b) minimise solar access to the east and west in the
summer,
c) maximise access to any prevailing summer breezes; and
d) minimise exposure to prevailing winter winds.
a) water supply;
b) reticulated sewerage;
c) stormwater drainage;
+d) power supply; and
‘e) telecommunications; AND :
‘016 The design and provision of public services and |
utilities, including sewerage, water, electricity, street lighting
and telecommunication services—
b) ensures health,
community;
c) protects the natural environmental values of the site and
safety and convenience of the
d) are cost effective over their life cycle;
e) minimises adverse impacts to the environment (including
the amenity of the local area) in the short and long term;
and
degrees off true an and has minimum: dimensions of—
a) if the lot is between 450mz and 599mz2- 10m x 15m; or
b) if the lot is less than 450mz2- 9m x 15m. AND
$13.2 Community Title Development: lots are generally
rectangular i in shape and have a maximum s/ope of—
a) 1 in 10° (10%); and
b) 1 in 20 (6%) when measured from the front to the rear of the
lot. -
$14.1 No Solution provided
14.189 Infrastructure
$15.1 All lots are -connected
telecommunications services; AND
to: power supply and
+} and telecommunications.
$16.1 For lots in urban settlements—power supply and
communications infrastructure are provided underground; OR ©
$16.2 For lots elsewhere—power supply and communications
infrastructure are provided underground unless—
a) located in the Rural Zone or Rural Settlement Zone: and
where not in a Bushfire Hazard Area as-defined on Overlay
Maps OM1.4-OM9.4;
_.b) new low voltage lines can be strung from poles. carrying”
existing high ‘voltage lines; or
c) no extensions to the existing
necessary; or
d) it is necessary to cross a body of water; AND.
.
“CadCon Surveying & Town Planning
Pane 6 of 11
Complies
-services and Proposed Lot 2 will easily
réticulation network ist".
accommodate a “future residential
building with the required dimensions
and orientation.
Complies
The proposal seeks to create the
maximum possible number of lots in
regards to the existing operational
infrastructure and allowable lot sizes
for this zone.
Complies
Each lot is capable of being serviced
by water supply, reticulated sewerage,
stormwater drainage, power supply
Proposed Lot 1 is fully connected to all
be connected in accordance with the
locality requirements.
er
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0515 - Lot reconfiguration (4 to 2) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.