Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

10/0515 - Lot reconfiguration (4 to 2) [As Published] · 152010.515

of 68

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

Appendix D: Reconfiguring a Lot Code

 

 

: foe ae 2 :
f) ensures that the existing systems are upgraded or
relocated to be capable of supporting the proposed
development;

O17 Essential public utilities are available and maintain
their function during flood events up to a 1% AEP (1:100
year ARI) flood event.

Electricity supply infrastructure
018 Uses and works maintain a safe distance from
electrical infrastructure including substations, overhead
ower lines, power poles and transformers.

 
  
 

 

019 Stormwater run-off is managed so as not to cause any
‘adverse impacts on the built or natural environment
including changes in quality, quantity or location of
stormwater discharges.

 

 

‘ x ore ee ,
St 6. 3 ‘Street | ane is provided i in accordance with Section 3. 19

14.190 Earthworks and stormwater management

of PSP5. Engineering Design Standards — Roads, Drainage and
Earthworks; AND

$16.4 For lots not within a sewerage service area—the lot has
sufficient area and other attributes to ensure sustainable on-site
sewerage disposal;

$17.1 Components of the infrastructure that are likely to fail or
may result in contamination are—

a) located above the level of a 1% AEP (1:100 year ARI) flood
event; or

b) designed and constructed to exclude water inundation or
infiltration and resist hydrostatic and hydrodynamic forces as a
result of inundation.

$18.1 Building footprints are situated clear of any power
easements on-site; AND

$18.2 Building footprints are not less than 50m from an existing
fenced electricity substation.

 

No solution provided

 

    
   
 
 
 
   
  
 
   
   

Complies
The proposed reconfiguration will not
change the existing public utilities.

Complies
The site is not near any power
easements or electricity substations.

       

  
      

Complies
The proposed reconfiguration will not
change the existing stormwater runoff.

 

 

020 Filling or excavation only occurs where it does not

 

No solution provided

| Not Applicable

 

 

 

 

 

landscape character of the site by utilising the natural
features of the site, which include—
a) watercourses and drainage lines;
b) significant trees;

c) understorey vegetation,

d) rock outcrops; and

 

adversely impact on— The proposal does not include
a) watercourses, drainage lines and wetlands; or earthworks.
b) vegetation on land identified on Biodiversity Overlay
Maps OM1.1-OM9.1; or
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
‘Complies

021 Land development responds to the distinctive | $21.7 The natural iandform and landscape are not modified to

accommodate the development.

 

‘| change the natural
..|, landscape.

The proposed reconfiguration will not
landform and

 

 

 

 

CadCon Surveying & Town Planning ae

.Pane 7 of 11

 

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0515 - Lot reconfiguration (4 to 2) [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.